Nine observations from a work measurement study using continuous timing are shown below. Allowances are determined as: personal, 7 percent; fatigue, 5 percent; delay, 6
Nine observations from a work measurement study using continuous timing are shown below. Allowances are determined as: personal, percent; fatigue, percent; delay, percent. the Work Measurement Excel template to determine the standard time for this operation.
Work
Observation
tableElementPerformance RatingA
Step by Step Solution
There are 3 Steps involved in it
Step: 1