Nine observations from a work measurement study using continuous timing are shown below. Allowances are determined as: personal, 6 percent; fatigue, 7 percent; delay,
Nine observations from a work measurement study using continuous timing are shown below. Allowances are determined as: personal, 6 percent; fatigue, 7 percent; delay, 5 percent. Use the Work Measurement Excel template to determine the standard time for this operation. Work Element 1 A B C D Observation 2 3 4 5 6 0.12 0.16 0.11 0.10 0.14 0.12 0.17 0.16 0.23 0.22 0.22 0.22 0.27 0.24 0.29 0.27 0.27 0.46 0.48 0.46 0.45 0.48 0.48 0.48 0.46 0.49 0.63 0.67 0.62 0.59 0.72 0.70 0.70 0.67 0.71 0.71 0.76 0.73 0.69 0.81 0.83 0.79 0.80 0.84 1.02 1.04 0.99 0.99 1.11 1.10 1.04 1.08 1.11 Round your answer to two decimal places. EF minutes 7 8 9 Performance Rating 0.17 115% 95% 85% 105% 95% 90% 4 5 6 2283 Vork Measurement Cengage Learning Enter data only in yellow-shaded cells. This template is designed for up to 10 woi Not for commercial use. 1 2 3 5 6 7 8 9 10 Vork element Get housing and stem Screw in stem Get and insert washer Get and insert screw Tighten screw Place assembly in tray Rating Observation 1 2 3 4 5 6 7 8 9 10 Sun Avera Time Cumulative #****** ****** **** ** 1.00 Element tim ## ###***********# ## 0.321 0.03 0.032 Cumulative 0.13 0.15 0.14 0.16 0.13 0.12 0.14 0.16 0.15 0.13 0.11 0.120 Element tim 0.10 0.12 0.12 0.13 ## ## 0.10 0.12 0.12 0.10 109 Cumulative ** ** ** ## ## 0.21 # 0.88 Element tim 0.11 0.10 0.12 0.13 0.10 ## 0.10 0.10 0.12 ## 106 Cumulative ************#####0.31 Element time 0.10 0.10 ## ## ## 0.10 Cumulative ####**** 0.51 ### Element tim 0.16 0.17 0.19 0.15 0.17 0.15 0.19 0.19 0.21 0.18 1.75 Cumulative 0.51 ## ###*********** Element tim *************0.34 Cumulative time Element tim Cumulative time Element tim Cumulative time Element tim Cumulative time Element tim 1.10 1.00 1.00 0.97 Normal Allowances 20% Standard T 1.00 0.11 0.106 0.09 0.088 0.18 0.170 0.03 0.034 Sum 0.550 0.66
Step by Step Solution
There are 3 Steps involved in it
Step: 1
The task at hand involves calculating the standard time for a work operation based on observations from a work measurement study considering the perfo...Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started