Answered step by step
Verified Expert Solution
Link Copied!

Question

00
1 Approved Answer

ohnson Electronics manufactures a power supply used in a variety of electronics products, including printers, modems, and routers. The demand for the part is 8,000

ohnson Electronics manufactures a power supply used in a variety of electronics products, including printers, modems, and routers. The demand for the part is 8,000 units per week. The production of the power supply requires six different manufacturing operations, each in sequence and each having the following processing times. The net available time to work is 62 hours per week, using two shifts.

Operation Processing Time (seconds)
Operation 1 24
Operation 2 21
Operation 3 28
Operation 4 23
Operation 5 33
Operation 6 26

Required:

1. What is the Takt time, in seconds, for this product? (Round your final answer to the nearest whole number.)

2. Is the processing line properly balanced for this product?

multiple choice

  • Yes

  • No

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access with AI-Powered Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Students also viewed these Accounting questions