Question
OMC Marine is trying to establish the standard labor cost of a typical water-cool pump repair. The following data have been collected from time and
OMC Marine is trying to establish the standard labor cost of a typical water-cool pump repair. The following data have been collected from time and motion studies conducted over the past month.
Actual time spent on pump repair:1.5 hours
Hourly wage rate:$18
Payroll taxes:10% of the wage rate
Onsite setup and downtime:10% of actual labor time
Final adjustments and testing:20% of actual labor time
Fringe benefits:25% of wage rate
(a) Determine the standard direct labor hours per pump repair
(b) Determine the standard direct labor hourly rate.
(c) Determine the standard direct labor cost per pump repair.
(d) If a pump repair took 1.75 hours at the standard hourly rate, what was the direct
labor quantity variance?
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started