Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

OMC Marine is trying to establish the standard labor cost of a typical water-cool pump repair. The following data have been collected from time and

OMC Marine is trying to establish the standard labor cost of a typical water-cool pump repair. The following data have been collected from time and motion studies conducted over the past month.

Actual time spent on pump repair:1.5 hours

Hourly wage rate:$18

Payroll taxes:10% of the wage rate

Onsite setup and downtime:10% of actual labor time

Final adjustments and testing:20% of actual labor time

Fringe benefits:25% of wage rate

(a) Determine the standard direct labor hours per pump repair

(b) Determine the standard direct labor hourly rate.

(c) Determine the standard direct labor cost per pump repair.

(d) If a pump repair took 1.75 hours at the standard hourly rate, what was the direct

labor quantity variance?

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image_2

Step: 3

blur-text-image_3

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Managerial Accounting

Authors: James Jiambalvo

7th Edition

1119577721, 978-1119577720

More Books

Students also viewed these Accounting questions

Question

The quality of the argumentation

Answered: 1 week ago