Answered step by step
Verified Expert Solution
Link Copied!
Question
1 Approved Answer

Two routes connect an origin and an destination, with performance functions t = 5+4 1 where x and c are the flow and capacity

Two routes connect an origin and an destination, with performance functions ( left.t_{1}=5+4left(frac{x_{2}}{x_{1}}ight 

Two routes connect an origin and an destination, with performance functions t = 5+4 1 where x and c are the flow and capacity for route i, respectively, in thousands of vehicles per hour and t; is the travel time for route / in minutes. The total traffic demand for the two routes is 4000 veh/h. Initially, the capacities of routes 1 and 2 are 3500 veh/h and 4600 veh/h, respectively. A construction project is planned that will cut the capacity of route 2 by 2100 veh/h. How many additional vehicle-hours of travel time will be added to the system assuming user equilibrium conditions hold? 503.5 525.3 77.6 55.3 for route 1 and t = 4+ 5 245.4 X C for route 2,

Step by Step Solution

3.49 Rating (149 Votes )

There are 3 Steps involved in it

Step: 1

Here c 1 and c 2 are capacities Given c 1 35 and c 2 46 1000 Vehhr Applying user equilibrium ... blur-text-image
Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image_2

Step: 3

blur-text-image_3

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Essentials Of Statistics For Business And Economics

Authors: David Anderson, Thomas Williams, Dennis Sweeney, Jeffrey Cam

7th Edition

1305081595, 978-1305081598

More Books

Students explore these related Civil Engineering questions

Question

What is meant by "realisation of profits"?

Answered: 3 weeks ago