One of the following is NOT true: The critical path method predicts total project duration. The critical path is the longest path through the network
One of the following is NOT true:
The critical path method predicts total project duration. | ||
The critical path is the longest path through the network diagram. | ||
The critical path for a project determines the latest completion date for the project. | ||
None of the above |
One of the following is NOT true:
Bottom- up estimates tool, used for cost estimation of a project, and it involves estimating the costs of individual work items and activities and summing them to get a project total. | ||
Three -point estimates tool, is used for cost estimation, and it involves estimating the most likely, optimistic, and pessimistic costs for items. | ||
Analogous estimates tool, used for cost estimation, is also called top-down estimates. | ||
Parametric estimating tool is less accurate than other tools used for cost estimation of a project. |
What approach to developing a WBS involves writing down or drawing ideas in a non linear format?
Top-down | ||
Bottom-up | ||
Analogy | ||
Mind Mapping |
A WBS for a project named, "Manufacturing of cars", is developed. Then the item" Manufacturing of cars" in the WBS is:
Level1 item | ||
level 2 item | ||
level 0 item | ||
None of the above |
Which tool or technique is for collecting requirements is often the most expensive and time consuming?
Interviews | ||
Focus groups | ||
Surveys | ||
Observation |
Typical problems with IT cost estimates include:
Estimates are done quickly, and people lack estimating experience. | ||
Human beings are biased towards overestimation. | ||
Top Management does not care about accuracy. | ||
All of the above. |
Scope ........................is often achieved by a customer inspection and the sign-off on key deliverables.
Acceptance | ||
Validation | ||
Completion | ||
Close-out |
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started