Only part B please
Banana Computer designs and manufactures high tech devices for public consumption. Currently, the Banana Executive team is considering the development of a new version of their popular smartphone. As with all their products, they intend to design the smartphone to meet current trends and manufacture the device in-house to maintain quality standards. Estimates have been made regarding the development project to take it to a point of operational manufacture. The estimates are based on the results of the projects for the two prior versions. The company requires meeting the product specifications, prefers to complete the project as close to schedule as possible, and is willing to assume some additional costs if necessary to meet a tighter schedule. Part 1 (100 points) Part 1. Use the information provided in Table 1 to develop the project schedule. Assume the project will begin on Jan. 1, 2021. A standard work week is to be applied to the schedule (Monday to Friday, 8 hours / day), with the only recognized holidays being New Year's Day, MLK Day, Memorial Day, July 4th, Labor Day, Thanksgiving Day and the day after, and December 25 and 26th. If a holiday falls on the weekend, the employees are out of luck. a. First, develop the schedule without considering resources. Save file. (20 points) b. Next, add the resources and determine the shortest feasible schedule as constrained by the resources in Table 2. Assume that tasks cannot be split. DO NOT resource level the project. Save as another file name. (40 points) c. Write a detailed memo to the executives about the schedule and any resource issues associated with the schedule. Provide and support your recommendations. (40 points) Resources Required Market Researchers Product Designen de AI AI H Manufacturing Engineers Aquition Spechlab 0.25 Task ID Task Description A Market Study B Functional Specifications IC Manufacturing Planning D Product Feature Selection E Develop Marketing Plan F Desire Manufacturin Process G Detailed Smartphone Design H Prototype Testins Finalize Product Design Order Parts KOrder Manufacturing Equipment L Install Equipment Duration in das Predecessors 25 A 20 A 10 BC 35 D 30 D 50 D 30 G 25 PH 7 1 0.25 35 JK Table 2. Resource Available for Project Duration S/hour Assigned to project 40 70 Resource Market Researchers Product Desieners Quality Engineers Manufacturing Engineers Acquisition Specialists 60 60 30 Banana Computer designs and manufactures high tech devices for public consumption. Currently, the Banana Executive team is considering the development of a new version of their popular smartphone. As with all their products, they intend to design the smartphone to meet current trends and manufacture the device in-house to maintain quality standards. Estimates have been made regarding the development project to take it to a point of operational manufacture. The estimates are based on the results of the projects for the two prior versions. The company requires meeting the product specifications, prefers to complete the project as close to schedule as possible, and is willing to assume some additional costs if necessary to meet a tighter schedule. Part 1 (100 points) Part 1. Use the information provided in Table 1 to develop the project schedule. Assume the project will begin on Jan. 1, 2021. A standard work week is to be applied to the schedule (Monday to Friday, 8 hours / day), with the only recognized holidays being New Year's Day, MLK Day, Memorial Day, July 4th, Labor Day, Thanksgiving Day and the day after, and December 25 and 26th. If a holiday falls on the weekend, the employees are out of luck. a. First, develop the schedule without considering resources. Save file. (20 points) b. Next, add the resources and determine the shortest feasible schedule as constrained by the resources in Table 2. Assume that tasks cannot be split. DO NOT resource level the project. Save as another file name. (40 points) c. Write a detailed memo to the executives about the schedule and any resource issues associated with the schedule. Provide and support your recommendations. (40 points) Resources Required Market Researchers Product Designen de AI AI H Manufacturing Engineers Aquition Spechlab 0.25 Task ID Task Description A Market Study B Functional Specifications IC Manufacturing Planning D Product Feature Selection E Develop Marketing Plan F Desire Manufacturin Process G Detailed Smartphone Design H Prototype Testins Finalize Product Design Order Parts KOrder Manufacturing Equipment L Install Equipment Duration in das Predecessors 25 A 20 A 10 BC 35 D 30 D 50 D 30 G 25 PH 7 1 0.25 35 JK Table 2. Resource Available for Project Duration S/hour Assigned to project 40 70 Resource Market Researchers Product Desieners Quality Engineers Manufacturing Engineers Acquisition Specialists 60 60 30