Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

OVERHEAD ALLOCATION STATEMENT Cost item Basis Total Machine Centre A Machine Centre B Assembly Materials Procure-ment General Manuf Support Primary allocation: Indirect materials Indirect labour

image text in transcribed

image text in transcribedimage text in transcribed

OVERHEAD ALLOCATION STATEMENT

Cost item Basis Total Machine Centre A Machine Centre B Assembly Materials Procure-ment

General

Manuf

Support

Primary allocation:
Indirect materials
Indirect labour
Property tax
Heating & lighting
Insurance: Machinery
Depreciation: Machinery Carrying value of machinery 900000
Insurance: Buildings Area 150 000
Salaries: Works Management
Secondary allocation:

Total allocated

overheads

QUESTION 1 (20 Marks) REQUIRED 1.1 Prepare the overhead allocation statement (using traditional costing). (14 marks) 1.2 Calculate the allocation rate (expressed to the nearest cent) for each of the production centres, based on machine hours for Machine centres A and B and direct labour hours for Assembly. (3 marks) 1.3 Calculate the overheads applied to each batch of the product. (3 marks) INFORMATION Perth Limited has three production centres (Machine Centre A, Machine Centre B and an Assembly Centre) and two service centres (Materials Procurement and General Manufacturing Support). The annual overhead costs are as follows: \begin{tabular}{|l|r|} \hline General Manufacturing Support & 6000 \\ \hline Indirect labour: & \\ \hline Machine Centre A & 600000 \\ \hline Machine Centre B & 600000 \\ \hline Assembly & 900000 \\ \hline Materials Procurement & 660000 \\ \hline General Manufacturing Support & 888000 \\ \hline Heating and lighting & 300000 \\ \hline Property tax & 600000 \\ \hline Insurance of machinery & 90000 \\ \hline Depreciation of machinery & 900000 \\ \hline Insurance of buildings & 150000 \\ \hline Salaries of works management & 480000 \\ \hline \end{tabular} The following information is also provided: Total materials issues (both direct and indirect) to the production centres are as follows: Secondary allocation: The value of materials issued is used as a basis for the Materials Procurement cost centre. Direct labour hours is then used as the basis for the General Manufacturing Support cost centre. The product is produced in batches of 100 . Each unit spends 5 hours in the Machine Centre A, 10 hours in Machine Centre B and 10 hours in the Assembly Centre. QUESTION 1 (20 Marks) REQUIRED 1.1 Prepare the overhead allocation statement (using traditional costing). (14 marks) 1.2 Calculate the allocation rate (expressed to the nearest cent) for each of the production centres, based on machine hours for Machine centres A and B and direct labour hours for Assembly. (3 marks) 1.3 Calculate the overheads applied to each batch of the product. (3 marks) INFORMATION Perth Limited has three production centres (Machine Centre A, Machine Centre B and an Assembly Centre) and two service centres (Materials Procurement and General Manufacturing Support). The annual overhead costs are as follows: \begin{tabular}{|l|r|} \hline General Manufacturing Support & 6000 \\ \hline Indirect labour: & \\ \hline Machine Centre A & 600000 \\ \hline Machine Centre B & 600000 \\ \hline Assembly & 900000 \\ \hline Materials Procurement & 660000 \\ \hline General Manufacturing Support & 888000 \\ \hline Heating and lighting & 300000 \\ \hline Property tax & 600000 \\ \hline Insurance of machinery & 90000 \\ \hline Depreciation of machinery & 900000 \\ \hline Insurance of buildings & 150000 \\ \hline Salaries of works management & 480000 \\ \hline \end{tabular} The following information is also provided: Total materials issues (both direct and indirect) to the production centres are as follows: Secondary allocation: The value of materials issued is used as a basis for the Materials Procurement cost centre. Direct labour hours is then used as the basis for the General Manufacturing Support cost centre. The product is produced in batches of 100 . Each unit spends 5 hours in the Machine Centre A, 10 hours in Machine Centre B and 10 hours in the Assembly Centre

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access with AI-Powered Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Students also viewed these Accounting questions