OVERLOAD CO makes gear module which includes two components: Component Lambda and Component Kappa. These components are produced in a Production resource and then assembled
OVERLOAD CO makes gear module which includes two components: Component Lambda and Component Kappa.
These components are produced in a Production resource and then assembled together in Assembly. A typical production cycle will include 300 units of Component Lambda and 400 units of Component Kappa and would involve two setups to switch between the two types of components. Each setup takes 30 minutes.
Suppose that Production of these components has 1 worker and is the bottleneck resource in the process. Each Component Lambda takes 420 seconds to make and each Component Kappa takes 60 seconds to make.
Assume that there is sufficient demand and the process is capacity-constrained. Further assume that the Production resources is the bottleneck resource. You are further told that:
Number of units of Component Lambda needed to make each gear module = 3
Number of units of Component Kappa needed to make each gear module = 4
a)What is the total processing time for each component set at Production?
b)What is the total processing time for each component set for Component Lambda at Production?
c)What is the total processing time for each component set for Component Kappa at Production?
d)If each setup at Production takes 30 minutes, what would be the total setup time in each production cycle?
e)Suppose that Production of these components has 1 worker and Production is the bottleneck resource in this process. What is the capacity of Production, process capacity per hour, flow rate and the utilization of production resource?
Step by Step Solution
There are 3 Steps involved in it
Step: 1
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started