Answered step by step
Verified Expert Solution
Question
1 Approved Answer
Paragraph Assignment Information You have been asked to take over from another engineer to deploy a new school network. The school currently does not
Paragraph Assignment Information You have been asked to take over from another engineer to deploy a new school network. The school currently does not have anyone using the network. Some of the backbone configuration is in place. The internet service provider link is connected, but further configuration is needed to make it work. You are given the following requirements to deploy and test the network. If your deployment is successful, you will be hired to deploy this through the entire school system. Use all the best practices for security and design to implement the network. Any information not given can be assumed. Remember to practices "Keep it Simple" principle. The DataCenter hosts some of the resources and most of the routing has been configured. Additional configuration will be needed for all devices to reach the DC. Do not change any of the pre-configurations, you may add to configurations, but not remove. The ISP and web server are outside the scope of your configuration. Do NOT apply passwords to the console ports. Resources Tasks DNS Server: 4.4.4.4 Email Server: mail.cisco.com - 4.4.4.3 Teacher Web: grade.cisco.com - 4.4.4.3 NTP Server: ntp.cisco.com - 4.4.4.4 Student Web: web.cisco.com - 1.1.1.1 1. Network Sizing (1 pts) This network design includes 5 subnets in the 10.10.0.0/16 range, create the following networks, , Tasks 1. Network Sizing (1 pts) This network design includes 5 subnets in the 10.10.0.0/16 range, create the following networks, minimum CIDR size should be /24. Network Description Staff Students loT Management CoreDistro 2. Naming Convention (2 pts) Devices to Support VLAN Assignment IP Assignments 115 10- 1100 20 100 50 20 2 90 n/a 10.10.0.0/30 Ensure all hostnames are configured to match the diagram Add descriptions to all switchports, use a common theme. Hint: Look if something was previously configured. 3. Network Core Requirements (7 pts) NAT to Internet for Staff and Students networks only Use an established ACL to limit internet traffic permitting only traffic from internal Staff and Students DHCP should be provided by the router as a central management point The Printer should have a static IP address in the Staff network using an address from one of the first 10 usable IP address in that LAN segment Ensure endpoints can route to the internet, no static routing All network gateways should be configured on the DistroSwitch Dynamic routing should be used between Layer 3 adjacent devices you are configuring, redistribute the static routes to enable full routing States) Text Predictions: On Accessibility: Good to go 15 16 y 96 5 E O OL LO 47 f8/ W 19 F10 (11 I 12 & 6 7 8 9 Modular Pod 3702i MHSLWAP3-Pod1 MHSSWA04-Pod1 OW Solar Panel JoT2 2911 2911 CoreRouter MHSRTC01 ISP Router 2960-24TT 360-24P DistroSwitch MHSSWD Server-PT DataCenter Student Web Server-1.1.1.1 000000 WLC-PT Wireless LAN Controller0 2960-24TT MHSSWA01 3702i 2960 24TT MHSLWAP1 MHSSWA02 2960-24TT MHSSWA03 3702i MHSLWAP2 Printer-PT Printer0 PC-PT Staff 1 PC-PT Admin 1 PC-PT Maintenance 1 3560-24PS DataCenter Switch1 Server-PT Staff Email & Web Server1 - 4.4.4.B Server-PT DNS & NTP Server2 - 4.4.4.4 Fire Last Status Source Destination Type Color Time(sec) Periodic Num Edit Delete Scenario 0 2911 81910X 819HGW 829 PT-Router PT-Emply 1841 2620XM 2621XM New Delete Toggle PDU List Window Select a Device to Drag and Drop to the Workspace) JA W ASUS
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started