Question

1 Approved Answer

. Part 1: Project Scheduling using the Critical Path Method Using the project activity data listed in Table 1: Project Activities and using pen or

. Part 1: Project Scheduling using the Critical Path Method Using the project activity data listed in Table 1: Project Activities and using pen or pencil and paper: ? Draw a network diagram for the project using the precedence diagramming method (PDM) and the following node notation format:

ES ID EF TS FS LS Dur LF ES = Early Start ID = Activity ID TS = Total Slack FS = Free Slack LS = Late Start Dur = Duration EF = Early Finish LF = Late Finish ?

Do forward and backward pass calculations and indicate the early and late start and finish times. ? Indicate the critical path. ? Indicate the total and free slack of each activity.?

Include a readable scan or photo of this drawing in your submission. ? Check your work with a computer-based project scheduling tool such as Microsoft Project (see Meredith et al, 2017, pp. 152-154). Include a screen shot of this check or the MS Project file with your submission.

image text in transcribed
Table 1: Project Activities Duration Activity ID Activity Description (weeks) Predecessors A Perform detailed site investigation and survey 2 Prepare detailed plans C Detailed design D Prepare site E Relocate services C F Realign overhead track electrification C, E G Construct access road and ramp D H Construct pilings Construct foundations and abutments K Construct temporary supports to support bridge decking during construction F, G L Plan fabrication of structural steel components C M Manufacture structural steel components off-site N Transport structural steel components and assemble on-site M P Erect pylons and fill with concrete Construct main span deck on pre-cast concrete beams H, K, N, P D H H H H N N H B W W N H N N N W N P R Install stay-cables and lift bridge deck off temporary supports Q Remove temporary supports T Install electrical system U Pave roadway surface V Perform finishing and ancillary tasks T, U W Commission bridge - cut over traffic V X Formal hand-over and ceremony W Y Project sign-off X Z Administrative closure W AA Project end (milestone) Y . Z

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Fundamentals of Management

Authors: Robbins, DeCenzo, Coulter

7th Edition

132996855, 0-13-610982-9 , 9780132996853, 978-0-13-61098, 978-0136109822

More Books