Question

1 Approved Answer

PART A Design a sewer running 0.7 times full at maximum discharge for a town provided with a separate sewer system, serving a population of

PART A

Design a sewer running 0.7 times full at maximum discharge for a town provided with a separate sewer system, serving a population of 80,000 persons. The water supplied from the water works to the town is at a rate of 190 LPCD. The mannings n = 0.013 for the pipe material and permissible slope is 1 in 600. Variation of n with depth may be neglected. Check for minimum and maximum velocity assuming minimum flow 1/3 of average flow and maximum flow as 3 times the average. (for d/D = 0.7, q/Q = 0.838, v/V = 1.12)

PART B: Numerical problems for submission

Problem # 1 Solve the problem in PART A above when the population increased to 100, 000 persons and the allowable pipe flowing 0.75 full at maximum discharge. The rate of water supply has been reduced to 150 LPCD due to new water regulations introduced. The required pipe to be used also has n = 0.013, and permissible S = 1 in 600.

solve PART B

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Metal Air Batteries Principles Progress And Perspectives

Authors: Ram K. Gupta

1st Edition

1032282088, 978-1032282084

More Books

Students also viewed these Chemical Engineering questions

Question

What is your intention in communicating this message?

Answered: 1 week ago