Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Part B (12 Marks) Pre-Fabricators Inc manufacturers and assembles prefabricated concrete and green heart homes for the lower to middle income housing market. There are

image text in transcribed
Part B (12 Marks) Pre-Fabricators Inc manufacturers and assembles prefabricated concrete and green heart homes for the lower to middle income housing market. There are three support departments and two production departments. The budgeted costs and the normal activity levels for each department are given below. Support Departments Production Departments Design and Fabrication Installation Concrete Green Personnel & assembly Overhead costs S150,000 $3,00.000 $1.820.000 Square feet 3600 2.400 60.000 72.000 Number of 618 employees Material Cost $45,000 $450,000 $720,000 2,000,000 $1,800,000 Homes (estimated production) Prime manufacturing $78,000 $62,500 cost per home Heart 200360 401 The allocation bases are as follows: Design - Number of Employees, Fabrication Square feet and Installation - Material costs. The production department allocates overhear cost to each case based on the budgeted cases produced for each product. Required 1). Using the step-down method, allocate the Design cost. (3Marks) 2). Set up the equations that should be solved if the reciprocal method is used to allocate the two-remaining support department cost to the production departments. (3 Marks) 3). Determine the cost per home using the reciprocal method of support cost allocation. (6Marks) Part B (12 Marks) Pre-Fabricators Inc manufacturers and assembles prefabricated concrete and green heart homes for the lower to middle income housing market. There are three support departments and two production departments. The budgeted costs and the normal activity levels for each department are given below. Support Departments Production Departments Design and Fabrication Installation Concrete Green Personnel & assembly Overhead costs S150,000 $3,00.000 $1.820.000 Square feet 3600 2.400 60.000 72.000 Number of 618 employees Material Cost $45,000 $450,000 $720,000 2,000,000 $1,800,000 Homes (estimated production) Prime manufacturing $78,000 $62,500 cost per home Heart 200360 401 The allocation bases are as follows: Design - Number of Employees, Fabrication Square feet and Installation - Material costs. The production department allocates overhear cost to each case based on the budgeted cases produced for each product. Required 1). Using the step-down method, allocate the Design cost. (3Marks) 2). Set up the equations that should be solved if the reciprocal method is used to allocate the two-remaining support department cost to the production departments. (3 Marks) 3). Determine the cost per home using the reciprocal method of support cost allocation. (6Marks)

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Information Technology Auditing

Authors: Hall, J Scott Harr

3rd Edition

1133008046, 978-1439079119

More Books

Students also viewed these Accounting questions

Question

Identify ways to increase your selfesteem.

Answered: 1 week ago