Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

PENG 3 3 1 1 - Production Engineering Fundamentals Problem Session 6 A well is to be connected to a production facility located 6 4

PENG 3311- Production Engineering Fundamentals
Problem Session 6
A well is to be connected to a production facility located 6400ft from the well. The separator operates at 200. The reservoir in the well is located at a depth of 5500ft. The following information is also know:
J=1.6bblday
Pr=2200
q0=420bpd(98% Oil)
GLR=800scfstb
No choke was used
Plot a system curve (IPR + VLP) for the well with the solution node at the wellhead (Pwh) for a tubing size of 2.441 inch ID (278 inch OD) and a flowline size of 2.5 inch ID. What system flowrate is possible for this configuration?
Construct an IPR and VLP for each of the three years below. What flowrate is possible in each of the future years?
\table[[Year,q0, bpd,qw,,bpd,GLR, scf/stb,Pr,
image text in transcribed

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Fundamentals Of Momentum Heat And Mass Transfer

Authors: James Welty, Gregory L. Rorrer, David G. Foster

6th Edition

1118947460, 978-1118947463

More Books

Students also viewed these Chemical Engineering questions