Answered step by step
Verified Expert Solution
Question
1 Approved Answer
( Petroleum engineering Qs - Integrated Reservoir management ) The material balance equation is one of the reliable approaches used by reservoir engineers to estimate
Petroleum engineering Qs Integrated Reservoir managementThe material balance equation is one of the reliable approaches used by reservoir engineers to estimate initial gas in place when enough productionpressure history is available. Consider below volumetric gas reservoir with production history data as shown in the below Table:
tableTime years,Reservoir Pressure, psia,Cumulative production, MMscf
The porosity, initial water saturation, crosssectional area, pay thickness, temperature, and specific gravity of gas are acres, and respectively. Identify the differences of gas initially in place between volumetric and method.
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started