Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Please a full answer CH 2 of a Required information [The following information applies to the questions displayed below) Craft Pro Machining produces machine tools

Please a full answer image text in transcribed
image text in transcribed
CH 2 of a Required information [The following information applies to the questions displayed below) Craft Pro Machining produces machine tools for the construction industry. The following details about overhead costs were taken from its company records. Production Activity Indirect Labor In...rect Materials Other Overhead Grinding $390,000 Polishing $190.000 Product modification 550,000 Providing power $250,000 Systen calibration 450,000 Additional information on the drivers for its production activities follows. Grinding and Polishing Product modification Providing power System calibration 15,000 machine hours 1,800 engineering hours 14,000 direct labor hours 600 batches Number of units Machine hours Engineering hours Batches Direct labor hours Job 3175 140 units 300 MH 34 eng. hours 28 batches 450 DLH Job 4286 1,750 units 3,000 MH 20 eng. hours 60 batches 4,050 DLH 140 units 300 MB 1,750 units 3.000 MH Number of units Machine hours Engineering hours Batches Direct labor hours 14 Cha 2a eng. Part 2 of hours 20 batches 450 OH hours 5 batches 4,050 OLH 666 pins Required: 2, 3 & 4. Compute the activity overhead rates using ABC. Combine the grinding and polishing costs into a single cost pool Determine overhead costs to assign to the above jobs using ABC. What is the overhead cost per unit for Job 3175? What is the overhead cost per unit for Job 42867 (Round your activity rate and average overhead cost per unit to 2 decimal places. Round "overhead assigned to the nearest whole dollar) Answer is not complete. Job 31 Activity Ovrhe Activity Drivers Activity Rate Activity dvered Overhead Cast 500.000 5 26.04 per machine our Grinding & Polishing Product modification 18,000 Machine hours 1.600 Engineering hra 550.000 343.75 per engineering hour 18,000 Direct labor hrs 13.33 per direct labor hour Providing power System calibration 205,000 500,000 1,400 batches 42143 per batch Mc

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Students also viewed these Accounting questions