Answered step by step
Verified Expert Solution
Question
1 Approved Answer
PLEASE ACTUALLY DRAW THE MODEL [20pts] See handout. Draw the structure for a Simio model for the production process (steps 4-5), with signs arriving individually
PLEASE ACTUALLY DRAW THE MODEL
[20pts] See handout. Draw the structure for a Simio model for the production process (steps 4-5), with signs "arriving" individually every 30 seconds constant from raw good storage, and "leaving" at end of line when enter finished good storage. Indicate the type of every element included and identify the value of significant properties (like service time expressions, resources used, ...). Use appropriate materials handling concepts to represent cart material handling. A company produces hand-painted yard \& home signs. It is primarily a wholesaler (i.e., its customers are typically shops that sell the signs to end customers). 1. Approximately 100 customer orders are placed per day via the internet (average of 10 signs each). Orders go directly into the production control system. Production is based on a monthly MRP schedule rather than as orders are placed. 2. Each sign requires a cut block of wood and possibly a yard stake ( 30% of signs) or fabric chain to hang it on a wall ( 15% of signs). Orders are placed weekly to different suppliers for each of these supplies ( 2 week lead time). 3. Upon receipt of supplies, they are put into a raw materials inventory where sit on average 4 days. 4. The background color is painted onto the signs. Time per sign is 30+NORM(30,7) seconds. The painting is done in batches of 20 and then the batch of signs are loaded onto a cart to dry. Drying takes an hour from time painted, although the carts sit on average 3 hours once full. A changeover in background color occurs once every 10-15 batches, and requires removing the previous paint container, clearing out the paint sprayer lines, and then putting in the new paint color container (changeover process that takes about 15 minutes). 5. Next the signs move (in batch) to a station where each sign is hand painted with text and detailing. Time per sign is 1+EXPO(2) minutes. Drying and sitting time are same as for previous step. 6. Signs are then moved to finished goods storage. They sit there on average for 5 days before being shipped. 7. Shipments are sent daily from finished goods. Order picking, packing and verification per order is 4 minutes. [20pts] See handout. Draw the structure for a Simio model for the production process (steps 4-5), with signs "arriving" individually every 30 seconds constant from raw good storage, and "leaving" at end of line when enter finished good storage. Indicate the type of every element included and identify the value of significant properties (like service time expressions, resources used, ...). Use appropriate materials handling concepts to represent cart material handling. A company produces hand-painted yard \& home signs. It is primarily a wholesaler (i.e., its customers are typically shops that sell the signs to end customers). 1. Approximately 100 customer orders are placed per day via the internet (average of 10 signs each). Orders go directly into the production control system. Production is based on a monthly MRP schedule rather than as orders are placed. 2. Each sign requires a cut block of wood and possibly a yard stake ( 30% of signs) or fabric chain to hang it on a wall ( 15% of signs). Orders are placed weekly to different suppliers for each of these supplies ( 2 week lead time). 3. Upon receipt of supplies, they are put into a raw materials inventory where sit on average 4 days. 4. The background color is painted onto the signs. Time per sign is 30+NORM(30,7) seconds. The painting is done in batches of 20 and then the batch of signs are loaded onto a cart to dry. Drying takes an hour from time painted, although the carts sit on average 3 hours once full. A changeover in background color occurs once every 10-15 batches, and requires removing the previous paint container, clearing out the paint sprayer lines, and then putting in the new paint color container (changeover process that takes about 15 minutes). 5. Next the signs move (in batch) to a station where each sign is hand painted with text and detailing. Time per sign is 1+EXPO(2) minutes. Drying and sitting time are same as for previous step. 6. Signs are then moved to finished goods storage. They sit there on average for 5 days before being shipped. 7. Shipments are sent daily from finished goods. Order picking, packing and verification per order is 4 minutesStep by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started