Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Please answer after a and b question This problem is based on the Former Radiator Factory Site. Groundwater pump and treat is being considered for

image text in transcribed

Please answer after a and b question

This problem is based on the Former Radiator Factory Site. Groundwater pump and treat is being considered for containment of the source area (triangle shape on property south of the railroad tracks). A single extraction well is proposed to capture and contain a TCE plume at the northern property boundary. The aquifer can be assumed to be isotropic and homogenous. Depth to groundwater is approximately 15 feet, and depth to bedrock is approximately 36 feet below ground surface near the downgradient property boundary (unconfined aquifer thickness is 21 feet) with a hydraulic conductivity of 2.4x104 cm/s and a hydraulic gradient of 0.05 m/m (ft/ft). Assume that the design drawdown at the extraction well is limited to 2 meters, and the extraction well diameter is 12 inches a) Estimate the pore volume of the source area b) Calculate transmissivity of the aquifer c) What extraction flow rate is required to contain the entire plume width? d) Where does the stagnation point occur downgradient of the extraction well? e) What is the capture zone width at the extraction well? f) What is the radial zone of influence of the extraction well? g) Provide a sketch of the zone of influence, the capture zone, and stagnation point. h) Estimated the number of contaminated pore volumes to be extracted by the system to meet remedial goals of Federal Maximum Contaminant Levels (MCLs) with the following maximum baseline concentrations and assuming linear sorption is the primary retardation mechanism (assume bulk density of 1.65 kg/L and 1% for foc) TCE = 200,00 ug/L Cis-1,2-Dichloroethene = 12,000 ug/L Vinyl Chloride = 1,000 ug/L i) Using the flow rate calculated in Part C, how many pore volumes would be removed in one year. Estimate the number of years the pump and treat system will need to operate to meet remedial goals. nccribed in tert

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Bioprocess Engineering Basic Concepts

Authors: Michael Shuler, Fikret Kargi, Matthew DeLisa

3rd Edition

0137062702, 978-0137062706

More Books

Students also viewed these Chemical Engineering questions