please answer all questions , the third oicture is two images bc its too long
Barstow Manufacturing Company has two service departments-product design and engineering support, and two production departments-assembly and finishing. The distribution of each service department's efforts to the other departments is shown below FROM TO Design Support Assembly Flnishing Design Support 20% 0% 10% 0% 30% 45% 60% 35% The direct operating costs of the departments (including both variable and fixed costs) were as follows: Design Engineering Support Assembly Finishing $140,000 $160,000 $550,000 $840,000 The total cost accumulated in the assembly department using the direct method is (calculate all ratios and percentages to 4 decimal places, for example 33.3333%, and round a dollar amounts to the nearest whole dollary $1,033,333 $1,690,000 $686,667 $646,667. $693,333. Question 6 Based on analyzing the relationship of total factory overhead (0 to direct labor hours 0). The following relationship was found: Y-$1,000+$2X The relationship is: Data shift. Nonlinear. Linear. O Probabilistic. points National Inc. manufactures two models of CMD that can be used as cell phones, MPX, and digital camcorders. Model High F Great P Annual Sales in Units 10,000 16,000 National uses a volume-based c costing system to apply factory overhead based on direct labor dollars. The unit prime costs of each product were as follow High F $38.00 17.52 Great P $25.40 13.14 Direct materials Direct labor Budget factory overhead Engineering and Design Quality Control Machinery Miscellaneous Overhead Total 2.,409 engineering hours 12.848 inspection hours 33,726 machine hours 26,400 direct labor hours $404,712 269,808 539,616 134.904 1.349.040 National's controller had been researching activity-based costing and decided to switch to i. A special study determined National's two products have the activities High F Great P 1,440 7,200 13,440 14,400 Engineering and design hours Quality control inspection hours Machine hours Labor hours 969 5.648 20,286 12,000 centi: ellaneous overhead for the Great P High F 38.00 17.52 Direct materials Direct labor $25.40 $13.14 Budget factory overhead: Engineering and Design Quality Control Machinery Miscellaneous Overhead Total 2,409 engineering hours 12,848 inspection hours 33,726 machine hours 26,400 direct labor hours $404,712 269,808 539,616 134,904 1.349.040 National's contriler had been researching activity-based costing and decided to switch to it. A specal study determined National's twe products hawe activities High F 969 5,648 20,286 12,000 Great P 1,440 7,200 13,440 14,400 Engineering and design hours Quality control inspection hours Machine hours Labor hours Using activity-based costing, applied miscellaneous overhead for the Great P model per unit is trounded to the nearest cent; $4.60. $9.45. $13.44 $15.12. $42.61