Answered step by step
Verified Expert Solution
Question
1 Approved Answer
Please answer all requirements. ACC319 Cost Accounting 2020 Fall Joseph Daly : 12/03/20 1:02 PM Homework: Chapter 7 and 8 Homework Save Score: 0 of
Please answer all requirements.
ACC319 Cost Accounting 2020 Fall Joseph Daly : 12/03/20 1:02 PM Homework: Chapter 7 and 8 Homework Save Score: 0 of 20 pts 1 2 of 5 (0 complete) HW Score: 0%, 0 of 100 pts P8-43 (similar to) is Question Help The Rossi Company uses a flexible budget and standard costs to aid planning and control of its machining manufacturing operations. Its costing system for manufacturing has two direct-cost categories (direct materials and direct manufacturing laborboth variable) and two overhead-cost categories (variable manufacturing overhead and fixed manufacturing overhead, both allocated using direct manufacturing labor-hours). The following actual results are for August :: (Click the icon to view the results.) Some additional information about Rossi Company's budget, standard costs and labor follows: (Click the icon to view additional information.) - X Data Table Read the requirements $179,300 F $724,500 U Requirement 1. Compute the listed amounts for August. Determine the formula, then complete the computation for each. (Abbreviations used: DM = Direct materials, mfg. = manufacturing, OH = Overhead.) a. Total pounds of direct materials purchased. Pounds of DM 612,000 Direct materials price variance (based on purchases) Direct materials efficiency variance Direct manufacturing labor costs incurred Variable manufacturing overhead flexible-budget variance Variable ufact overhead ency variance Fixed manufacturing overhead incurred 10,650 U 18,600 U purchased 557,470 - X Print - X Done Requirements More Info At the 30,000 budgeted direct manufacturing labor-hour level for August, budgeted direct manufacturing labor is $750,000, budgeted variable manufacturing overhead is $300,000, and budgeted fixed manufacturing overhead is $600,000 listed amounts - X 1. Compute the following for August: a. Total pounds of direct materials purchased b. Total number of pounds of excess direct materials used c. Variable manufacturing overhead spending variance d. Total number of actual direct manufacturing labor-hours used e. Total number of standard direct manufacturing labor-hours allowed for the units produced f. Production-volume variance 2. Describe how Rossi's control of variable manufacturing overhead items differs from its control of fixed manufacturing overhead items. The standard cost per pound of direct materials is $11.50. The standard allowance is 6 pounds of direct materials for each unit of product. During August, 30,000 units of product were produced. There was no beginning inventory of direct materials. There was no beginning or ending work in process. In August, the direct materials price variance was $1.10 per pound. In July, labor unrest caused a major slowdown in the pace of production, resulting in an unfavorable direct manufacturing labor efficiency variance of $315,000. There was no direct manufacturing labor price variance. Labor unrest persisted into August. Some workers quit. Their replacements had to be hired at higher wage rates, which had to be extended to all workers. The actual average wage rate in August exceeded the standard average wage rate by $0.50 per hour. a. Total pounds of direct materials purchased b. Total number of pounds of excess direct materials used c. Variable manufacturing overhead spending variance d. Total number of actual direct manufacturing labor-hours used e. Total number of standard direct manufacturing labor-hours allowed for the units produced f. Production-volume variance Print Done Print Done Print Done Choose from any list or enter any number in the input fields and then click Check Answer. ACC319 Cost Accounting 2020 Fall Joseph Daly : 12/03/20 1:02 PM Homework: Chapter 7 and 8 Homework Save Score: 0 of 20 pts 1 2 of 5 (0 complete) HW Score: 0%, 0 of 100 pts P8-43 (similar to) is Question Help The Rossi Company uses a flexible budget and standard costs to aid planning and control of its machining manufacturing operations. Its costing system for manufacturing has two direct-cost categories (direct materials and direct manufacturing laborboth variable) and two overhead-cost categories (variable manufacturing overhead and fixed manufacturing overhead, both allocated using direct manufacturing labor-hours). The following actual results are for August :: (Click the icon to view the results.) Some additional information about Rossi Company's budget, standard costs and labor follows: (Click the icon to view additional information.) - X Data Table Read the requirements $179,300 F $724,500 U Requirement 1. Compute the listed amounts for August. Determine the formula, then complete the computation for each. (Abbreviations used: DM = Direct materials, mfg. = manufacturing, OH = Overhead.) a. Total pounds of direct materials purchased. Pounds of DM 612,000 Direct materials price variance (based on purchases) Direct materials efficiency variance Direct manufacturing labor costs incurred Variable manufacturing overhead flexible-budget variance Variable ufact overhead ency variance Fixed manufacturing overhead incurred 10,650 U 18,600 U purchased 557,470 - X Print - X Done Requirements More Info At the 30,000 budgeted direct manufacturing labor-hour level for August, budgeted direct manufacturing labor is $750,000, budgeted variable manufacturing overhead is $300,000, and budgeted fixed manufacturing overhead is $600,000 listed amounts - X 1. Compute the following for August: a. Total pounds of direct materials purchased b. Total number of pounds of excess direct materials used c. Variable manufacturing overhead spending variance d. Total number of actual direct manufacturing labor-hours used e. Total number of standard direct manufacturing labor-hours allowed for the units produced f. Production-volume variance 2. Describe how Rossi's control of variable manufacturing overhead items differs from its control of fixed manufacturing overhead items. The standard cost per pound of direct materials is $11.50. The standard allowance is 6 pounds of direct materials for each unit of product. During August, 30,000 units of product were produced. There was no beginning inventory of direct materials. There was no beginning or ending work in process. In August, the direct materials price variance was $1.10 per pound. In July, labor unrest caused a major slowdown in the pace of production, resulting in an unfavorable direct manufacturing labor efficiency variance of $315,000. There was no direct manufacturing labor price variance. Labor unrest persisted into August. Some workers quit. Their replacements had to be hired at higher wage rates, which had to be extended to all workers. The actual average wage rate in August exceeded the standard average wage rate by $0.50 per hour. a. Total pounds of direct materials purchased b. Total number of pounds of excess direct materials used c. Variable manufacturing overhead spending variance d. Total number of actual direct manufacturing labor-hours used e. Total number of standard direct manufacturing labor-hours allowed for the units produced f. Production-volume variance Print Done Print Done Print Done Choose from any list or enter any number in the input fields and then click CheckStep by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started