Question
please answer all the parts of the question within 30 minutes. make sure the explanation and reasons are explained in very detailed manner as in
please answer all the parts of the question within 30 minutes. make sure the explanation and reasons are explained in very detailed manner as in why the option is correct and why other options sre incorrect give reasons for the same , Attempt the answer only if your are 100% sure that its correct. else leave it for other tutor otherwise i will give negative ratings and will also report your answer for unprofessionalism. Make sure the answer is 100% correct and is not copied from anywhere. ATTEMPT THE QUESTION ONLY IF YOU ARE 100% CORRECT AND SURE. ELSE LEAVE IT FOR ANOTHER TUTOR. BUT PLEASE DONT PUT WRONG ANSWER ELSE I WILL REPORT.
a} Dene the concept of social mobility in a context of rural community development. b} Based on the project of East Coast Rail Link {ECRL}, discuss two {2} important things that accelerate the economic growth of coastal community at East-Coast Malaysia. c} Why the entrepreneurs of East-Coast lvlalaysia nearby the East Coast Rail Link {EGRL} could be considered as experiencing process of changing in community development? Explain. d} Sustainability also be defined as a ways of reducing negative human impact and increase environmentally-friendly. List and discuss three [3] criteria of sustainability that become prominent to the East Coast Rail Link {ECHL} as a part of community-based development. KUALA LUMPUR, April 19- The spill over effects of the East Coast Rail Link (ECRL) project are projected to change the socio-economic landscape of the states concerned and stimulate economic development. The mega public transport initiative, involving a 640-kilometre track, is expected to have a huge impact on the states which will be in the path of the ECRL, namely Kelantan, Terengganu, Pahang, Negri Sembilan, Federal Territory of Putrajaya and Selangor. The project is expected to be completed in December 2026, with the realigned track passing through 20 stations, starting from Kota Baru to Kuala Terengganu, Kuantan and Mentakab in the coast coast and then Jelebu, Bangi/Kajang, Putrajaya Sentral and, finally, Port Klang. The project will also benefit the existing KLIA Express Rail Link (ERL) and the upcoming MRT2 SSP Line's interchange in Putrajaya Sentral. On April 15, Prime Minister Tun Mahathir Mohamad announced the resumption of the ECRL project and said its cost has been reduced to RM68.7 million per kilometre from RM95.5 million a kilometre as per the earlier agreement. The total cost of the project was slashed by RM21.5 billion to RM44 billion. Stimulate urbanisation, tourism The ECRL project will have the capacity to stimulate urbanisation, particularly in the areas where the stations are located, said Universiti Malaysia Terengganu's Centre for Social and Economic Development Studies senior lecturer Dr Nazli Aziz. He said the local communities can expect to benefit from the development of new infrastructure and facilities, which constitute the basis of growth of new urban centres. According to him, the new rail link would also boost opportunities for the tourism industry because people would have a faster and easier transportation option to get to various destinations in the east coast, which is famed for its scenic beaches and idyllic islands. When an urbanisation process takes place, visitor numbers will increase. It will also create job opportunities for the locals in the context of entrepreneurial development," he said. Nazli felt that the ECRL would also help to balance the development between Help entrepreneurs With Terengganu being on the ECRL route. Nazli hoped that it would help lower the cost of goods, especially food prices, in the state. "This is because moving bulk cargo by train is cheaper than by air or via trucks," he said, adding that the prices of ready- to-eat food items were higher in Terengganu than in Kelantan or Pahang. "For a long time, Terengganu has been depending on lorries to transport food items, whereas Kelantan has rail services and Pahang has port facilities," he said. East Coast Malay Batik Makers Association chairman Kamarozzaman Mohd Salleh said the local business community was awaiting the completion of the ECRL as it would make it more convenient for them to travel from Kelantan and Terengganu to Kuala Lumpur for business purposes. "We make frequent trips to Kuala Lumpur, so we support the development of the new rail link. It will benefit businessmen like me," he said. The ECRL is expected to reduce travel time from Kota Bharu to Putrajaya Sentral to about four hours, from eight to 12 hours at present. Mohd Pozi Hassan, who operates a 'keropok lekor' (a form of fish cracker) cafe in Kuala Terengganu, is also waiting to enjoy the spillover effects of the project. "I expect more tourists to visit Terengganu, which will surely lead to better business for those involved in the food business," he said Economic opportunities Bank Islam Malaysia Berhad chief economic analyst Mohd Afzanizam Abdul Rashid said the new agreement signed between Malaysia Rail Link Sdn Bhd and China Communications Construction Company Lid would, among others, see local participation increasing to 40 per cent from 30 per cent earlier. This, he said, would have a positive impact on Malaysia's construction, manufacturing and services sectors. "Construction jobs valued at RM17.6 billion will be offered to local contractors. "Apart from that, there will also be a higher demand for construction materials such as steel, cement and stones, as well as professional services of engineers, architects and quantity surveyors," he said. Also set to swell is the demand for skilled workers, particularly those equipped with skills related to railway construction. "We're aware that Malaysia has many technical and polytechnic institutes capable of producing skilled workers for the railway sector," he said. The presence of a bigger workforce will spur the economy of small- and medium- sized businesses, as well as increase the demand for food, houses, grocery stores and transport in the states where the (ECRL) track will pass through. Mohd Afzanizam added that the project is also significant when viewed from its long-term perspective as it is part of China's mega Belt and Road Initiative. Furthermore, the Kuantan Port- ECRL-Port Klang section will shorten travel time between the two ports. - BernamaStep by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started