Answered step by step
Verified Expert Solution
Question
1 Approved Answer
please answer this i need answer this e + f ppocess? [LO7-5] y kestile Sudies does custom metal sculptures of horses and other animals. A
please answer this
i need answer this e + f
ppocess? [LO7-5] y kestile Sudies does custom metal sculptures of horses and other animals. A horse culpure is composed of numerous parts. They use a lathe to construct two types of puts. The "Body" part is used to support the torso of the horse and the "Leg" part is wesed to support the legs. Each horse sculpture needs 1 Body part and 4 Leg parts. smich thing between either of the types of parts requires 25 minutes. Once ready to prodice, the lathe produces a Body part in 4 minutes and a single Leg part in 2 minutes. the ladedele in which they make 100 Body parts and then 400 Leg parts. Furthermore, assume the lathe is the bottleneck. Q What is the maximum number of horse sculptures Keuka can make per hour? c. Suppose Keuka is demand-constrained and they have 1 worker who is able to assemble a horse sculpture in 16 minutes. What is the average inventory of Body parts? [L07-4] d. Suppose Keuka is demand-constrained and they have 1 worker who is able to assemble a horse sculpture in 16 minutes. What is the average inventory of Legs? [L07-4] e. Suppose Keuka is demand-constrained and they have 1 worker who is able to assemble a horse sculpture in 16 minutes. If Keuka designs a cyclic schedule for the lathe, how many Body parts should they make in each batch so as to minimize inventory while not constraining the flow through assembly? (Do not round your answer to a integer.) [LO7-5] constrain [LO7-5] 5. Keuka Studies does custom metal sculptures of horses and other animals. A horse sculpture is composed of numerous parts. They use a lathe to construct two types of parts. The "Body" part is used to support the torso of the horse and the "Leg" part is used to support the legs. Each horse seulpture needs I Body part and 4 Leg parts. Switehing between either of the types of parts requires 25 minutes. Onee ready to produce, the lathe produces a Body part in 4 minutes and a single Leg part in 2 minutes. The lathe only makes horse parts. For parts (a)-(d) assume Keuka operates a cyelic schedule in which they make 100 Body parts and then 400 Leg parts. Furthermore, assume the lathe is the bottleneck. a. What is the maximum number of horse sculptures Keuka can make per hour? [6] [LO7.2] b. What is the utilization (\%) of the lathe? [ [S] [LO.3] c. Suppose Keuka is demand-constrained and they have I worker who is able to assemble a horse sculpture in 16 minutes. What is the average inventory of Body parts? [S] [LO7-4] d. Suppose Keuka is demand-onstrained and they have I worker who is able to assemble a horse sculpture in 16 minutes. What is the average inventory of Legs? [\$) [L.O7-4] e. Suppose Keuka is demandeonstrained and they have I worker who is able to assemble a horse sculpture in 16 minutes. If Keuka designs a cyelic schedule for the lathe, how many Body parts should they make in each batch so as to minimize inventory while not constraining the flow through assembly? (Do not round your answer to an integer.) [Q] [LO7.5] f. Suppose Keuka is demandeonstrained and they have I worker who is able to assemble a horse sculpture in 16 minutes. If Keuka designs a cyelie sehedule for the lathe, how many Legs should they make in each batch so as to minimize inventory while not constraining the flow through assembly? (Do not round your answer to an integer.) [(9) [LO7.5] ppocess? [LO7-5] y kestile Sudies does custom metal sculptures of horses and other animals. A horse culpure is composed of numerous parts. They use a lathe to construct two types of puts. The "Body" part is used to support the torso of the horse and the "Leg" part is wesed to support the legs. Each horse sculpture needs 1 Body part and 4 Leg parts. smich thing between either of the types of parts requires 25 minutes. Once ready to prodice, the lathe produces a Body part in 4 minutes and a single Leg part in 2 minutes. the ladedele in which they make 100 Body parts and then 400 Leg parts. Furthermore, assume the lathe is the bottleneck. Q What is the maximum number of horse sculptures Keuka can make per hour? c. Suppose Keuka is demand-constrained and they have 1 worker who is able to assemble a horse sculpture in 16 minutes. What is the average inventory of Body parts? [L07-4] d. Suppose Keuka is demand-constrained and they have 1 worker who is able to assemble a horse sculpture in 16 minutes. What is the average inventory of Legs? [L07-4] e. Suppose Keuka is demand-constrained and they have 1 worker who is able to assemble a horse sculpture in 16 minutes. If Keuka designs a cyclic schedule for the lathe, how many Body parts should they make in each batch so as to minimize inventory while not constraining the flow through assembly? (Do not round your answer to a integer.) [LO7-5] constrain [LO7-5] 5. Keuka Studies does custom metal sculptures of horses and other animals. A horse sculpture is composed of numerous parts. They use a lathe to construct two types of parts. The "Body" part is used to support the torso of the horse and the "Leg" part is used to support the legs. Each horse seulpture needs I Body part and 4 Leg parts. Switehing between either of the types of parts requires 25 minutes. Onee ready to produce, the lathe produces a Body part in 4 minutes and a single Leg part in 2 minutes. The lathe only makes horse parts. For parts (a)-(d) assume Keuka operates a cyelic schedule in which they make 100 Body parts and then 400 Leg parts. Furthermore, assume the lathe is the bottleneck. a. What is the maximum number of horse sculptures Keuka can make per hour? [6] [LO7.2] b. What is the utilization (\%) of the lathe? [ [S] [LO.3] c. Suppose Keuka is demand-constrained and they have I worker who is able to assemble a horse sculpture in 16 minutes. What is the average inventory of Body parts? [S] [LO7-4] d. Suppose Keuka is demand-onstrained and they have I worker who is able to assemble a horse sculpture in 16 minutes. What is the average inventory of Legs? [\$) [L.O7-4] e. Suppose Keuka is demandeonstrained and they have I worker who is able to assemble a horse sculpture in 16 minutes. If Keuka designs a cyelic schedule for the lathe, how many Body parts should they make in each batch so as to minimize inventory while not constraining the flow through assembly? (Do not round your answer to an integer.) [Q] [LO7.5] f. Suppose Keuka is demandeonstrained and they have I worker who is able to assemble a horse sculpture in 16 minutes. If Keuka designs a cyelie sehedule for the lathe, how many Legs should they make in each batch so as to minimize inventory while not constraining the flow through assembly? (Do not round your answer to an integer.) [(9) [LO7.5] Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started