please assist with this MRP schedule problem. 3.2 A wheelbarrow is made up of: one wheel (A); one bucket (B); two legs (C), and two
please assist with this MRP schedule problem.
3.2 A wheelbarrow is made up of: one wheel (A); one bucket (B); two legs (C), and two handles (D). The wheel (A) is made up of one axle (E), three spacers (F) and one axle bracket (G). The master production schedule, lot sizes, lead times, on-hand inventory and scheduled receipts are given below: 3.2.1 Construct a product structure tree for the wheelbarrow. Identify all levels, parents, and components. (3) [TURN OVER] 6 EPT1601 3.2.2 Prepare a Material Requirements Plan (MRP) for the wheelbarrow to cover a 6-week planning period (Use the table on the next page to answer the question). (11)Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started