Answered step by step
Verified Expert Solution
Question
1 Approved Answer
Please assure the correctness of filled in inforamtion and provide the remaining answers to the packet down below. CHANDLER CORP. DATA SHEET Exhibit 1 Dat
Please assure the correctness of filled in inforamtion and provide the remaining answers to the packet down below.
CHANDLER CORP. DATA SHEET Exhibit 1 Dat levery unit prius) Resource Design/Drafting Engineering Fabrication Powder coating Scheduling General factory TEM Existing Capacity Available and Used and Capacity Costs Current capacity and usage (annual) Practical Purchased Cost Used Capacity Cost Driver of Capacity Capacity 20,000 design hours $ 500,000.00 19,500 15,000 engineering hr $ 750,000.00 14,750 40,000 parts $ 30,000.00 39,000 400,000 square feet $ 1,800,000.00 210,000 750 job setups $ 756,000.00 80,000 machine hrs$ 2,400,000.00 64,000 batch (prius by the soup) Product (cost from one pond to another 4 monasmet (dat foc facility 640 faality Exhibit 2 Resource needs for potential new products Pheq uirtumuns for hequrtmunts for 13o Pool Snedes loo Trellises Botin Pool shade Trellis requirements requirements Cost Driver 50 30 20 50 O * 40 Resource Design/Drafting Valut Engineering Fabrication Unit Powder coating Unt Scheduling Oni General factory Walt design hours engineering hrs parts square feet job setups machine hrs 1600 22120 VHO 400 Cloo *29) 1330 170 (120 xlavo) 142.00d0 *o) 10, 200 1400 x 120 GOx ) Q0 10 170* 0) 9,400 uox10) COLO O, 120 202,200 10 10.200 80 0.3076 120|| Desired profit on sales Demand Pool shades Demand Trellises Pool shade 42,500.00 18,750.00 Selling price per unit Material cost per unit Trellis 4,300.00 700.00 CHANDLER CORP. DATA SHEET Exhibit 1 Dat levery unit prius) Resource Design/Drafting Engineering Fabrication Powder coating Scheduling General factory TEM Existing Capacity Available and Used and Capacity Costs Current capacity and usage (annual) Practical Purchased Cost Used Capacity Cost Driver of Capacity Capacity 20,000 design hours $ 500,000.00 19,500 15,000 engineering hr $ 750,000.00 14,750 40,000 parts $ 30,000.00 39,000 400,000 square feet $ 1,800,000.00 210,000 750 job setups $ 756,000.00 80,000 machine hrs$ 2,400,000.00 64,000 batch (prius by the soup) Product (cost from one pond to another 4 monasmet (dat foc facility 640 faality Exhibit 2 Resource needs for potential new products Pheq uirtumuns for hequrtmunts for 13o Pool Snedes loo Trellises Botin Pool shade Trellis requirements requirements Cost Driver 50 30 20 50 O * 40 Resource Design/Drafting Valut Engineering Fabrication Unit Powder coating Unt Scheduling Oni General factory Walt design hours engineering hrs parts square feet job setups machine hrs 1600 22120 VHO 400 Cloo *29) 1330 170 (120 xlavo) 142.00d0 *o) 10, 200 1400 x 120 GOx ) Q0 10 170* 0) 9,400 uox10) COLO O, 120 202,200 10 10.200 80 0.3076 120|| Desired profit on sales Demand Pool shades Demand Trellises Pool shade 42,500.00 18,750.00 Selling price per unit Material cost per unit Trellis 4,300.00 700.00Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started