please can you make up any project of any class from 2 to 9 Cash Flow Projection Template Project Name: Prepared by: Date: Week 0

please can you make up any project of any class from 2 to 9

Cash Flow Projection Template

Project Name:

Prepared by:

Date:

Week 0

Week 1

Week 2

Week 3

Week 4

Beginning

Cash Balance

(BCB)

Total Cash

Inflow (TCI)

Cash Outflow

Accounts

payable

Payroll

Total Cash

Outflow

(TCO)

Net Cash

Outflow

(NCO)

Ending Cash

Balance

Generic Final Cost Report

Prepared by

Project

Executive Summary ?

Project Objectives ?

Methodology ?

Cost and Budget Plans ?

Results ?

Cost Variations ?

Conclusions and Recommendations ?

Risk Assessment Template

Project Name:

Prepared by:

Date:

Risk Rating Matrix

Note: The risk rating matrix below is not designed for a specific project. You must still update the table below to reflect the risk rating matrix to be applied to the project you are undertaking as part of the assessment.

Likelihood

Consequence

Insignificant

Minor

Moderate

Major

Severe

1

2

3

4

5

A (Almost certain)

High

High

Very High

Very High

Very High

B (Likely)

Moderate

High

High

Very High

Very High

C (Possible)

Low

Moderate

High

Very High

Very High

D (Unlikely)

Low

Low

Moderate

High

Very High

E (Rare)

Low

Low

Moderate

High

High

LIKELIHOOD

1.

A (Almost certain)

Is expected to occur in most circumstances

2.

B (Likely)

Will probably occur in most circumstances

3.

C (Possible)

Could occur at some time

4.

D (Unlikely)

Not likely to occur in normal circumstances

5.

E (Rare)

May occur only in exceptional circumstances

CONSEQUENCE

1.

Insignificant

Minor injuries, external reputation not affected, no environmental damage, threat of litigation, etc.

2.

Minor

Minor casualties that require medical attention off-site, no long term effects, external reputation minimally affected, minor environmental damage, single minor litigation, etc.

3.

Moderate

Several casualties that require hospitalisation with no long term effects, some environmental damage, single moderate litigation, etc.

4.

Major

Serious casualties, external reputation severely damaged, would cause extensive environmental damage, single major litigation, etc.

5.

Severe

Legal consequences, multiple litigations, termination of the contract, loss of life, permanent disability, external reputation irrevocably damaged, catastrophic environmental damage, etc.

ID

Date Identified

Risk Description

Likelihood of the Risk

Occurring

Impact if the Risk

Occurs

Rating

Mitigating Action

Who is responsible?

Date implemented

How will this be reviewed?

(Risk review process)

Revised Likelihood of the Risk Occurring

Revised Impact if the

Risk Occurs

Revised Risk Rating

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Welcome To Hospitality An Introduction

Authors: Kaye Kye-Sung Chon, Thomas A. Maier

3rd Edition

1111780684, 9781111780685

More Books

Students also viewed these General Management questions

Question

Context, i.e. the context of the information presented and received

Answered: 1 week ago