Question
PLEASE CAN YOU MAKE UP ANY WORKPLACE AND PROJECT. THANK YOU 1. Access and review the construction drawings and specifications of the building project. Based
PLEASE CAN YOU MAKE UP ANY WORKPLACE AND PROJECT.
THANK YOU
1. | Access and review the construction drawings and specifications of the building project. Based on the documents you reviewed, answer the following questions below. After completing this task, submit a copy of the construction drawings and specifications that you reviewed to your assessor. |
i. | What is the name of the building project?
|
ii. | Specify whether the building project is a residential or commercial building.
|
iii. | Identify the number of storeys of the building project.
|
iv. | Identify the National Construction Code (NCC) building classification of the building project in the project plan. Specify the subclass, if necessary. |
v. | Explain why the building project belongs under the NCC building classification specified previously.
|
vi. | Indicate the intended use of the building project in the project plan.
|
vii. | Identify the location of the building project in the project plan.
|
viii. | Based on the location identified, indicate the NCC climate zone under which the building project belongs.
|
2. | Access and review the assessment reports for each of the following: NCC Bushfire Compliance NCC High Wind Compliance NCC Earthquake Compliance iv. NCC Alpine Environment Compliance Based on the assessment reports you reviewed, complete the table below. After completing this task, submit a copy of the assessment reports that you reviewed to your assessor. |
Elements | Performance Requirements | Compliance method applied based on the assessment report | Corresponding building standard used in the compliance method | Performance Requirement met? | General Requirement met? |
Bushfire |
|
|
| Yes No | Yes No |
|
|
| Yes No | Yes No |
High Wind |
|
|
| Yes No | Yes No |
|
|
| Yes No | Yes No |
Earthquake |
|
|
| Yes No | Yes No |
|
|
| Yes No | Yes No |
Alpine Environment |
|
|
| Yes No | Yes No |
|
|
| Yes No | Yes No |
3. | Access and review the project plans and specifications of the building project. Based on the project plans and specifications you reviewed, complete the table below. After completing this task, submit a copy of the project plans and specifications that you reviewed to your assessor. |
Source | Building design material | Section properties | Effect on various building design materials if dimensions are changed | ||
Shape | Dimensions | ||||
Project plans |
|
|
|
| |
Project specifications |
|
|
|
|
4. | Research and identify two new building technologies and two emerging building technologies that can be applied in the construction process of the building project. For contextualisation, new and emerging building technologies are: i. New building technologies - building technologies made during the year 2015 onwards and used immediately by the industry ii. Emerging building technologies - building technologies made before the year 2015 but have only gained prominence during 2015 onwards Explain how they would be applied to the construction process, as well as the advantages and disadvantages of the building technologies identified. The corresponding construction processes must be based on the construction drawings and specifications provided. After completing this task, submit a copy of the construction drawings and specifications that you based the construction processes on to your assessor. |
New Building Technologies | |||
Building Technology | How it is applied in the construction process | Advantage | Disadvantage |
|
|
|
|
|
|
|
|
Emerging Building Technologies | |||
Building Technology | How it is applied in the construction process | Advantage | Disadvantage |
|
|
|
|
|
|
|
|
5. | Identify the NCC requirements that need to be complied with, based on the new and emerging building technologies you identified in Practical Assignment Task 4. Cite the Australian Standard related to the building technology that you specified. Explain the importance of complying with the NCC requirements and the Australian Standard specified. |
New Building Technologies | |||
Building Technology | NCC Requirement | Australian Standard | Importance of complying with the relevant documents |
|
|
|
|
|
|
|
|
Emerging Building Technologies | |||
Building Technology | NCC Requirement | Australian Standard | Importance of complying with the relevant documents |
|
|
|
|
|
|
|
|
6. | Access and review the project plans and specifications of the building project. Based on the plans and specifications you reviewed, answer the following questions below. After completing this task, submit a copy of the project plans and specifications that you reviewed to your assessor. |
i. | Based on the project specifications, list down two earthworks applied for the building project. a. b. |
ii. Based on the project plans, complete the table below.
Footing or Slab Type | Dimensions (e.g., length, width, thickness, diameter) | Depth of Excavation of Footing or Slab |
|
|
|
7. | Access and review the assessment reports for the performance of reinforcement, concrete and other structural footing elements. Based on the assessment reports you reviewed, complete the table below. After completing this task, submit a copy of the assessment reports that you reviewed to your assessor. |
Structural Footing Elements | Performance Requirements | Compliance method applied based on the assessment report | Corresponding building standard used in the compliance method | Performance Requirement met? |
Reinforcement |
|
|
| Yes No |
Concrete |
|
|
| Yes No |
Vapour Barriers |
|
|
| Yes | |
No | |||||
Filling Under Concrete Slabs |
|
|
| Yes No |
8. | Access and review the project plans and specifications of the building project. Based on the plans and specifications you reviewed, complete the table below. For your guidance: Floorings Systems - e.g. slab on ground, suspended slab, floor frame, etc. Materials - refers to the type of material used for the corresponding flooring system (e.g. steel, concrete, timber, engineered wood, etc.) Configuration - i.e. Dimensions such as length, width, thickness Components - any integral attachments to the floor system e.g. particle boards, cement boards, etc. After completing this task, submit a copy of the project plans and specifications that you reviewed to your assessor. |
Flooring Systems | Materials | Configuration | Components |
|
|
|
|
|
|
|
|
9. | Access and review the construction drawings and specifications of the building project. Based on the construction drawings and specifications you reviewed, answer the following questions below. After completing this task, submit a copy of the construction drawings and specifications that you reviewed to your assessor. |
i. | Based on the construction drawings and specifications, identify the type of suspended floor (e.g. steel floor framing, timber floor framing) applied in the building project.
|
ii. | Identify two span requirements in the NCC relevant to the type of suspended floor applied in the building project. a. b. |
iii. | Identify two standards relevant to floor component sections for the type of suspended floor applied in the building project. a. b. |
10. | Access and review the construction drawings and specifications for the building project. Based on the construction drawings and specifications you reviewed, complete the table below. After completing this task, submit a copy of the construction drawings and specifications that you reviewed to your assessor. |
Floor Framing | ||||
Requirement | NCC Performance Requirements | Compliance method applied, as specified in the construction drawings and specifications | NCC Performance Requirements met? | |
Climate Zone |
|
| Yes | |
No | ||||
Fire Resistance |
|
| Yes | |
No | ||||
Rising Damp |
|
| Yes | |
No |
12. | Access and review the construction drawings and specifications for the building and construction project. Based on the construction drawings and specifications you reviewed, complete the tables below. After completing this task, submit a copy of the construction drawings and specifications that you reviewed to your assessor. |
Stru | ctural Wall Systems | ||
Types of wall systems | Erection Process | Advantage | Disadvantage |
|
|
|
|
|
|
|
|
Non-Structural Wall Systems | |||
Types of wall systems | Erection Process | Advantage | Disadvantage |
|
|
|
|
|
|
|
|
13. | Access and review the construction drawings and specifications for the building and construction project. Based on the construction drawings and specifications you reviewed, complete the tables below. After completing this task, submit a copy of the construction drawings and specifications that you reviewed to your assessor. |
Steel Framing | |||
Materials used | NCC Performance Requirements | Compliance method applied, as specified in the construction drawings and specifications | NCC Performance Requirements met? |
|
|
| Yes No |
|
|
| Yes No |
Timber framing | ||||
Materials used | AS 1684 Residential timberframed construction requirements | Compliance method applied, as specified in the construction drawings and specifications | A | S 1684 Residential timberframed construction requirements met? |
|
|
| Yes | |
No | ||||
|
|
| Yes | |
No |
14. | Access and review the construction drawings and specifications for the building and construction project. Based on the construction drawings and specifications you reviewed, complete the table below. After completing this task, submit a copy of the construction drawings and specifications that you reviewed to your assessor. |
Services | Components | Allowances for installation of service components |
Electrical |
|
|
Plumbing |
|
|
Mechanical |
|
|
15. | Access and review the construction drawings and specifications for the building and construction project. Based on the construction drawings and specifications you reviewed, complete the table below. After completing this task, submit a copy of the construction drawings and specifications that you reviewed to your assessor. |
Type of structural roof system | Components | NCC Performance Requirements | Compliance method applied, as specified in the construction drawings and specifications | NCC Performance Requirements met? |
|
|
|
| Yes No |
|
|
| Yes No |
16. | Access and review the assessment report for the structural performance of cladding to be used for bracing in the frame construction. Based on the assessment report you reviewed, complete the table below. After completing this task, submit a copy of the assessment report that you reviewed to your assessor. |
Type of cladding | Performance Requirements | Compliance method applied based on the assessment report | Corresponding building standard used in the compliance method | Performance Requirement met? |
|
|
|
| Yes No |
|
|
|
| Yes No |
17. | Access and review the manufacturer specifications for the structural performance of cladding to be used for bracing in the frame construction. Based on the assessment report you reviewed, complete the table below. After completing this task, submit a copy of the assessment report that you reviewed to your assessor. |
Type of cladding | Requirements based on manufacturer specifications | Properties of the type of cladding used | Cladding property complies with manufacturer specifications? | |
|
|
| Yes | |
| No | |||
|
|
| Yes | |
No |
18. | Access and review the construction drawings and specifications for the building and construction project. Based on the construction drawings and specifications you reviewed, complete the table below. After completing this task, submit a copy of the construction drawings and specifications that you reviewed to your assessor. |
Wall cladding components | NCC Performance Requirements | Compliance method applied, as specified in the construction drawings and specifications | NCC Performance Requirements met? | |
Vapour permeable sarking or waterproof membrane |
|
| Yes No | |
Flashing to wall openings |
|
| Yes | |
No | ||||
Parapet cappings |
|
| Yes | |
No |
19. | Access and review your organisation's workplace safety policies and procedures. After reviewing the safety policies and procedures, provide the following information in the table below: Your organisation's safety policies Your organisation's safety procedures Three types of information in the Staff Register related to workplace safety iv. Three safety clothing that staff must wear in the workplace After completing this task, submit a copy of your organisation's workplace safety policies and procedures that you based your answers on to your assessor. |
i. |
ii. |
iii.
|
iv.
|
20. | Access and review your organisation's workplace quality policies and procedures. After reviewing the general policies and procedures, provide the following information in the table below: Your organisation's workplace quality policies Your organisation's workplace quality procedures After completing this task, submit a copy of your organisation's workplace quality policies and procedures that you based your answers on to your assessor. |
i. |
ii. |
21. | Access and review the construction contracts for the building and construction project. After reviewing the construction contracts, answer the following questions below. After completing this task, submit a copy of the construction contracts for the building and construction project that you based your answers on to your assessor. |
i.
| Describe the various construction contracts in the table below.
| ||||||||
ii. | Based on the construction contracts of the building project, what is the construction contract classification according to the intended use of the building? |
iii. | Explain why the construction contract is classified as such.
|
iv. | What is the type of contract applied for the building and construction project?
|
v. | Based on the information found in the construction contracts, explain the quality specifications for the type of contract you indicated in Item iii.
|
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started