please do this question fast why are you not doing question on time.
SPO223824 hours, 22 mndes remaining 12 Logan is a speciais sports car manufacturer win a variety of nation sape The company is stead launch the Logan XX a special editin spars roadster Podzice of the Login XX wie brand b 100 cm The financial controler has called that direct costs her each Logan XX will be Materials - 19.500 Labour. 15 000 He has also analysed the companys de recusamus vertebb Nede Cost de Production line 11 400 Bachus Transportation - delves 2000 No fleres Transportation - distance 720.000 Distance Total 1640.000 Note 1 The production is used bral Logun modes and stay production time taken frogatud de racire Note Al cars are delivered to stewrooms on rangerte anche altres per per Note 13 The bandes 2 DELL The production line is used for all Logan models and has a working capacity of 60 000 machine hours. The production time taken for Logan XX will be 14 machine fous percar Note 2 Al cars are delvered to showrooms an transporters which make 6,400 desibenes per yox Note 3 The transporters travel a total dl 225 000 krms within this total e company epect each Logan xabay average 100 kms 03/a). Calculate the cost driver rate for each of the production line and transportation overheads 03/b. Calculate the overhead costs which would be allocated to each Loan XX car using the dead costing principles 03/c). Confirm the total cost of producing and delivering a Logan XV cat including the overhead allocations you calculated in part/b] 9:30* 03/d). Give one advantage and one disadvantage of using Activity Based Costing Fill in your answer here B LUX DELL SPO223824 hours, 22 mndes remaining 12 Logan is a speciais sports car manufacturer win a variety of nation sape The company is stead launch the Logan XX a special editin spars roadster Podzice of the Login XX wie brand b 100 cm The financial controler has called that direct costs her each Logan XX will be Materials - 19.500 Labour. 15 000 He has also analysed the companys de recusamus vertebb Nede Cost de Production line 11 400 Bachus Transportation - delves 2000 No fleres Transportation - distance 720.000 Distance Total 1640.000 Note 1 The production is used bral Logun modes and stay production time taken frogatud de racire Note Al cars are delivered to stewrooms on rangerte anche altres per per Note 13 The bandes 2 DELL The production line is used for all Logan models and has a working capacity of 60 000 machine hours. The production time taken for Logan XX will be 14 machine fous percar Note 2 Al cars are delvered to showrooms an transporters which make 6,400 desibenes per yox Note 3 The transporters travel a total dl 225 000 krms within this total e company epect each Logan xabay average 100 kms 03/a). Calculate the cost driver rate for each of the production line and transportation overheads 03/b. Calculate the overhead costs which would be allocated to each Loan XX car using the dead costing principles 03/c). Confirm the total cost of producing and delivering a Logan XV cat including the overhead allocations you calculated in part/b] 9:30* 03/d). Give one advantage and one disadvantage of using Activity Based Costing Fill in your answer here B LUX DELL