please give detailed information f48 Mean 8x8+ 7 x 5+6x6 + 5 x 10+ 4 x 3 + 3x 14+2 x 7+1 x 3 256
please give detailed information
f48 Mean 8x8+ 7 x 5+6x6 + 5 x 10+ 4 x 3 + 3x 14+2 x 7+1 x 3 256 8+5+6+10+3+14+7+3 = 4.57 jobs 56 (v) Lateness of the various jobs is given by Job no 1 2 3 4 5 6 7 8 Lateness : -2 -2 4 7 9 6 8 6 -2 -2 + 4 + 7 + 9 +6+8+6 36 lateness = = 45 minutes 8 8 Maximum lateness = 9 minutes (W) Number of jobs actually late = 6 Thus EDD rule has reduced the maximum lateness from 22 minutes to 9 minutes. However, it has increased the mean lateness from - 3625 minutes to 4.5 minutes. Also the number of late jobs has increased from 4 to 6. C. Slack Time Remaining (STR) Rule Slack time for a job is defined as the due date of the job minus its processing time. Sequencing the jobs in such a way that the jobs with the least slack time are picked up first for processing, followed by the one with the next smallest slack time and so on is called the slack time remaining (STR) rule EXAMPLE 5.3-4 The information regarding jobs to be scheduled through one machine is given below. Job E F G Processing time (days) + 12 2 11 10 3 6 Due date (days) 20 30 15 16 18 5 9 () What is the first come first served (FCFS) schedule ? (10) What is the shortest processing time (SPT) schedule ? (11) What is the slack time remaining (STR) schedule ? (iv) What is the earliest due date (EDD) schedule ? (w) What are the mean flow times for each of the schedules above? B DStep by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started