Answered step by step
Verified Expert Solution
Question
1 Approved Answer
please give detailed information Step 4 Make a program by starting with zero time (origin O) and moving through the various stages of completion (points)
please give detailed information
Step 4 Make a program by starting with zero time (origin O) and moving through the various stages of completion (points) till the point marked 'finish is reached. Choose path consisting only of horizontal, vertical and 45 lines. A horizontal line represents work on job I while job 2 remains idle; a vertical line represents work on job 2 while job 1 remains idle and a 45 line to the base represents simultaneous work on both the jobs Step 5 Find the optimal path (program). An optimal path is one that minimizes idle time on job 1 as well as job 2. Obviously, the optimal path is one which coincides with 45 line to the maximum extent. Further, both jobs cannot be processed simultaneously on one machine. Graphically, this means that diagonal movement through the blocked out areas is not allowed. A good path, accordingly, is chosen by eye and drawn on the graph (path OUVWXYZ). Step 6 Find the elapsed time. It is obtained by adding the idle time for either job to the processing time for that job. The idle time for the chosen path is found to be 4 + 6 = 10 hours for job 1 and 4 hours for job 2 . Total elapsed time = 34 + 10 = 44 hrs. (considering job 1) = 40 + 4 = 44 hrs. (considering job 2) Step 7 6 f52 E ATTIRER 40 10 18 44 The optimal schedule corresponding to the chosen path is shown in Fig. 5.5. A B D E Job 10 18 22 28 40 44 B D Job 2 24 28 44 1 5 10 15 20 25 30 35 40 Time (hrs.) Fig. 5.5 The optimal schedule on various machines for jobs 1 and 2 as evident from Fig. 5.5 is Machine A job 1 precedes job 2 machne B job 2 precedes job 1, machine c job 2 precedes job 1, machine D job 2 precedes job I, and machine E job 2 precedes job 1. EXAMPLE 5.6-3 Two major parts P, and P2 for a product require processing through six machine centres. The technological sequence of the parts on six machines and manufacturing times on each machine are Machine sequence: A E F D B Time (hrs.): 2 3 4 5 6 1 Machine sequence: B A E F C D Part 2 Time (hrs.): 3 2 5 3 2 3 Part P What would be the optimal scheduling to minimize the total processing time for these two parts? Find also the total elapsed time. For each machine specify the part that should be processed firstStep by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started