Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Please help Two alternative infrastructure renewal plans are being considered for a city's civil systems in its downtown area. The alternative plans (A and B)

image text in transcribedimage text in transcribed

Please help

Two alternative infrastructure renewal plans are being considered for a city's civil systems in its downtown area. The alternative plans (A and B) differ from each other in terms of three performance criteria: (a) life-cycle economic value (NPV), (b)consistency with the city's long-range plans, and () effects on the environment. As the engineering consultant, you have been hired to advice the city government on which of two plans is the best to implement. You are evaluating these plans based on the three performance criteria. For each alternative plan, the level of each performance criterion is given in the table below. NPV: In millions Consistency Rating: Index 0-20 (o is worst, 20 ks best) For this. a higher index is more desirable 10 15 Environmental Consequences: Index 0-50 (o is best, 50 is worst. For this. a higher index is less desirable 25 35 Plan A Plan B 7.0 5.0 Using the concepts of weighting, scaling, and amalgamation, determine which of the two plans would you recommend for the downtown renewal. Use the table below. See Appendix 1 for the relative weights between the performance criteria; and see Appendix 2 for the scaling functions for each performance criterion. 2 OVERALL VALUE OR UTILITY Economic Value (NPV) Weight = Consistency Rating Weight= Environmental Consequences Weight = System Plan A Scaled = Weighted & scaled = Scaled Weighted & scaled = Scaled Weighted & scaled U: Scaled = Weighted & scaled Scaled Weighted & scaled Scaled = Weighted & scaled = Uz = Based on the U values, the superior alternative is APPENDIX 1 (Weights of the Performance Measures) The relative importance among the performance criteria are as follows: Cast 0.50 Consistency with existing plans 0.30 Environnemental impacts 0.20 APPENDIX 2 (Utility Functions for Scaling of the Performance Criteria) 100 75 Your Degree of Satisfaction% 50 25 0 8 5 6 7 Net Present Value (Smillions) 100 100 75 75 Your Degree of Satisfaction (%) 50 Your Degree of Satisfaction (%) 50 25 25 0 0 0 20 5 10 15 20 25 30 35 8 40 Consistency with existing plans (Index) Environmental Consequences (Index) Two alternative infrastructure renewal plans are being considered for a city's civil systems in its downtown area. The alternative plans (A and B) differ from each other in terms of three performance criteria: (a) life-cycle economic value (NPV), (b)consistency with the city's long-range plans, and () effects on the environment. As the engineering consultant, you have been hired to advice the city government on which of two plans is the best to implement. You are evaluating these plans based on the three performance criteria. For each alternative plan, the level of each performance criterion is given in the table below. NPV: In millions Consistency Rating: Index 0-20 (o is worst, 20 ks best) For this. a higher index is more desirable 10 15 Environmental Consequences: Index 0-50 (o is best, 50 is worst. For this. a higher index is less desirable 25 35 Plan A Plan B 7.0 5.0 Using the concepts of weighting, scaling, and amalgamation, determine which of the two plans would you recommend for the downtown renewal. Use the table below. See Appendix 1 for the relative weights between the performance criteria; and see Appendix 2 for the scaling functions for each performance criterion. 2 OVERALL VALUE OR UTILITY Economic Value (NPV) Weight = Consistency Rating Weight= Environmental Consequences Weight = System Plan A Scaled = Weighted & scaled = Scaled Weighted & scaled = Scaled Weighted & scaled U: Scaled = Weighted & scaled Scaled Weighted & scaled Scaled = Weighted & scaled = Uz = Based on the U values, the superior alternative is APPENDIX 1 (Weights of the Performance Measures) The relative importance among the performance criteria are as follows: Cast 0.50 Consistency with existing plans 0.30 Environnemental impacts 0.20 APPENDIX 2 (Utility Functions for Scaling of the Performance Criteria) 100 75 Your Degree of Satisfaction% 50 25 0 8 5 6 7 Net Present Value (Smillions) 100 100 75 75 Your Degree of Satisfaction (%) 50 Your Degree of Satisfaction (%) 50 25 25 0 0 0 20 5 10 15 20 25 30 35 8 40 Consistency with existing plans (Index) Environmental Consequences (Index)

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image_2

Step: 3

blur-text-image_3

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Students also viewed these Accounting questions

Question

Define induction and what are its objectives ?

Answered: 1 week ago

Question

Discuss the techniques of job analysis.

Answered: 1 week ago

Question

How do we do subnetting in IPv6?Explain with a suitable example.

Answered: 1 week ago

Question

Explain the guideline for job description.

Answered: 1 week ago

Question

What is job description ? State the uses of job description.

Answered: 1 week ago

Question

b. What groups were most represented? Why do you think this is so?

Answered: 1 week ago