Answered step by step
Verified Expert Solution
Question
1 Approved Answer
please I need answer of this question. 14 16 90 40 04: MS XYZ Company Manufactures Sports bikes and supplies them to the local market.
please I need answer of this question.
14 16 90 40 04: MS XYZ Company Manufactures Sports bikes and supplies them to the local market. A local sub-contracting manufacturer supplies the wheels to the MIS XYZ Company through a purchase contract. The sub-contracting company initially purchases aluminium billets as raw material and manufactures wheels by forming each billet into wheel rims. Both the rims (front and rear) are assembled with spokes, front and rear hubs. Front wheels comprise a front rim, 24 spokes and a front hub Rear wheels comprise a rear rim, 24 spokes and a rear hub 6) Draw the Bill of Material (BOM) tree for the front and rear wheels [4 Marks) (6) Referring to table 40) and 4cl)complete the Material Requirements Planning (MRP) and determine when to Purchase Orders placed for the spokes. [26 Marks] Table 40 Week 12 13 15 17 Demand for the bikes 80 70 120 100 85 Demand of Front Rim 50 30 125 The demand of Rear Rim Table 4 () Part/Component Lead Time Stock on Hand Batch Stre Safety Stock Bike UNIA 100 0 Front wheel 1 UNIA 100 Rear wheel 1 150 125 Front Rim WNIA Rear Rim UNIA 100 Front Hub UNIA 150 50 Rear Hub UNIA 100 Spokes UNIA 3.000 1,100 70 60 80 1 120 UNIA 150 100 100 2 1 1 50 1 CW 14 16 90 40 04: MS XYZ Company Manufactures Sports bikes and supplies them to the local market. A local sub-contracting manufacturer supplies the wheels to the MIS XYZ Company through a purchase contract. The sub-contracting company initially purchases aluminium billets as raw material and manufactures wheels by forming each billet into wheel rims. Both the rims (front and rear) are assembled with spokes, front and rear hubs. Front wheels comprise a front rim, 24 spokes and a front hub Rear wheels comprise a rear rim, 24 spokes and a rear hub 6) Draw the Bill of Material (BOM) tree for the front and rear wheels [4 Marks) (6) Referring to table 40) and 4cl)complete the Material Requirements Planning (MRP) and determine when to Purchase Orders placed for the spokes. [26 Marks] Table 40 Week 12 13 15 17 Demand for the bikes 80 70 120 100 85 Demand of Front Rim 50 30 125 The demand of Rear Rim Table 4 () Part/Component Lead Time Stock on Hand Batch Stre Safety Stock Bike UNIA 100 0 Front wheel 1 UNIA 100 Rear wheel 1 150 125 Front Rim WNIA Rear Rim UNIA 100 Front Hub UNIA 150 50 Rear Hub UNIA 100 Spokes UNIA 3.000 1,100 70 60 80 1 120 UNIA 150 100 100 2 1 1 50 1 CW Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started