Please provide the following:Analysis and Solutions The best option for equipment upgrades Balanced Ordering Practice Short-term (1 year) Product Pricing Equipment Change for Larger Order

Please provide the following:Analysis and Solutions

  1. The best option for equipment upgrades
  2. Balanced Ordering Practice
  3. Short-term (1 year) Product Pricing
  4. Equipment Change for Larger Order Size
image text in transcribedimage text in transcribed
sprayed with stain guard. You were told that wash and dry of plush bundles would averagely take 15 and 20 minutes respectively. At the end of your tour Ali and Abbas told you that they ensure all the rubber and plush jobs are carefully checked for quality before they are shipped to the customer. \"On average we spent about 5 minutes on each bundle to make sure the outgoing bundles are clean, dry, treated and tagged properly. You asked them how many of eachjob order they receive. Ali said the number of orders slightly change at different times of the year, but ballpark 80% of their orders are rubber jobs and 20% is for plush. You asked about the break down of rubber orders and they said mats and runner each form 40% of orders. Ali theu invited you back to his office, offered you coffee and asked his shipping Formau, Malek to join in. After coffee he said: \"I am rather content with my business, but at times, particularly in winter, we take more jobs and I sometimes worry that we might fall behind. I don't know, perhaps it would be helpful to have a map of our operation to gure what can give 11s headache and what needs to be done about it. I also would very much like to lmow our effective hourly capacity for rubber mat orders. I really don*t know the average capacity of the store in terms of order per hour for rubber and plush jobs. Malek here has some challenges with delivery of nished jobs. Malek started by saying \"I am in charge of shipping and receiving. Our orders are brought in every morning by our own trucks. The same trucks pick up nished jobs for delivery in the afternoon. We have three trucks: a lG-footer, a lS-footer and a 20-footer, which is newer and can cover out of town up to Milton. Our 10-footer handles 36 orders, the lS-footer can do 5 6 and the 20-footer can do up to T6 orders a day.\" You asked Malek about the cost of delivery for these trucks. \"Well, let's see,\" replied Malek picking a pile of invoices and going through them \"considering the salary of drivers, fuel, repairs and other odds and ends, the lO-footer takes roughly $16 for nibber matjobs and 812 for plushjobs. The lS-footer takes away $16 for rubber mat or runnerjobs and $20 for plush jobs respectively. The 20-footer grabs $18 for rubber mats or runners and $22 for plushjobs.\" You asked him if he has had any issues with them and he said: \"Currently we use these trucks in no particular order and ball park we spend S3 500 a day. I would like to know if we can do better. I wonder how we can assign orders to them to bring our cost down\". Leaving their ofce, you promised them to write a report that would address their concerns. Your group is required to collaborate on preparing this technical report. Please provide the following: Analysis and Solutions a. The best option for equipment upgrades b. Balanced Ordering Practice 4:. Short-term {1 year} Product Pricing d. Equipment Change for Larger Order Size Borlog Services Borlog Services is a sizable familyowned workshop in Mississauga that offers cleaning and repair services for factories, garages, hospitals, retailers and offices in GTA and beyond. The shop has been founded and is owned by Ali Karami who started this business in 1975 by going to repair shops, collecting their door mats to wash them in his small pick-up truck. In nearly two decades he expanded his operation to what it is today. Crucial to his business success was his keen attention to ne detailing and rejuvenating old mats, which brought him a sound reputation among the clients he served. The bu 1k of Borlog orders come for cleaning rubber-based mats and runners. Equipped with latest cleaning machinery, the workshop operates 8 hours a day, five days a week {Monday- Friday] throughout the year. Rooted to Ali's reputation with refurbishing plush products [door mat, runners. area matsr'rugs), the shop also accepts cleaning orders of these products. While Mike is satisfied with his operation revenue, he sometimes gets upset about the backlog of orders that could negatively impact efcient and timely delivery of the finished jobs to some clients. As an expediting measure, the shop receives the orders in rolled bundle tagged for each client and delivers the nished jobs in the same maimer and using the same tags. In an attempt to manage efficient and timely delivery and improve his operation, Ali has hired your group as consultants to examine the Borlog operations and offer recommended solutions. Last Monday your group held a meeting in his ofce where he provided the following operational details. \"I am very obsessed with clean delivery of finished jobs, so all jobs come into the shop oor in our trucks, bundled and tagged by order number and client's name and when finished shipped out in our own trucks.\" Ali continued \"Upon arrival, bundles are inspected by our receivers to make sure they are all good. On average, this is done in about 5 minutes. After that jobs would be divided into two categories": a} Rubber and b} Plush. All rubber jobs will go through three processes: scarping, wash and dry..-"'s1\"1ine.Nowlet's walk through the shop and see them done in action." said Ali. During your tour of rubber operations, you noted that in \"scraping" stage, mats and runners were guided through scraper rollers to remove debris from grooved surface {e.g., gum, duck tapes, sand, etc.) from the surface. Different scrapers were used for mats and runners. You were told that on average bundles of runners and mats were scarped in 6 minutes and 3 minutes respectively. Next, bundles of mats and runners were washed in separate machines. You were told that machine washng of runner and mat bundles are averagely completed in 10 and 5 minutes respectively. All washed rubber jobs were dried by pressure air and surface coated with a shine spray. You were advised that these activities averagely are completed in 8 minutes and 4 minutes for runners and mats respectively. Ali's brother, Abbas took your group for a tour of Plush operation and you noted bundles first went through detail wash whereby they were washed four times with different chemicals to remove dirt and stain. Next, they were dried through heat rollers and hot air blowers and

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Working In Teams Moving From High Potential To High Performance

Authors: Brian A. Griffith ,Ethan B. Dunham

1st Edition

1452286302, 978-1452286303

More Books

Students also viewed these General Management questions

Question

Prepare an ID card of the continent Antarctica?

Answered: 1 week ago

Question

What do you understand by Mendeleev's periodic table

Answered: 1 week ago