Answered step by step
Verified Expert Solution
Question
1 Approved Answer
please show all calculations by hand, thank you. 8) Excel Manufacturing has an activity-based costing system with three activity cost pools- Machining, Batch Setup, and
please show all calculations by hand, thank you.
8) Excel Manufacturing has an activity-based costing system with three activity cost pools- Machining, Batch Setup, and other. The company's overhead costs have already been allocated to the cost pools and total $28,000 for the Machining cost pool, $13,800 for the Batch Setup cost pool, and $27,200 for the Other cost pool. Costs in the Machining cost pool are assigned to products based on machine-hours (MHS) and costs in the Batch Setup cost pool are assigned to products based on the number of batches. Costs in the Other cost pool are not assigned to products. Data concerning the two products and the company's costs appear below: Product A Product B Total MHS Batches 5,200 500 14.800 500 20,000 1.000 Product B Product A $124,300 Sales (total) Direct materials (total) $53,100 $166,000 $71,500 $56,600 $54,000 Direct labor (total) Required: a. Calculate activity rates for each activity cost pool using activity-based costing. Machining Batch Setup b. Determine the amount of overhead cost that would be assigned to each product using activity- based costing. Product A Product B c. Determine the product margins for each product using activity-based costing. Product A Product B 6Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started