Question
Please show the followin:g Defined Variables (if needed) System of Linear Inequalities (if needed) Desmos Picture List of Valid Corner Points: Please keep decimals exact
Please show the followin:g
- Defined Variables (if needed)
- System of Linear Inequalities (if needed)
- Desmos Picture
- List of Valid Corner Points: Please keep decimals exact to one decimal place if needed.
- Full Sentence Conclusion (if needed)
1. Minimize
C = 9x + 6y subject to: 3x + 2y 60
10x + 4y 180 y 24 x 0; y 0
2. Maximize and minimize z = 3x + 4y (18pts total) s.t.
2x + 10y 80 6x + 2y 72 3x + 2y 6 x 0; y 0
3. A contracter builds boathouses in two basic models, the Atlantic and the Pacific. Each Atlantic model requires 1000 ft of framing lumber, 3000 ft3 of concrete and $2000 for advertising. Each Pacific model requires 2000 ft of framing lumber, 3000 ft3 of concrete and $3000 for advertising. Contracts call for using at least 8000 ft of framing lumber, 18000 ft3 of concrete, and $15,000 worth of advertising. If the construction cost for each Atlantic model is $30,000 and the construction cost for each Pacific model is $40,000, how many of each model should be built to minimize construction costs? (19pts total)
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started