Please show work so I can learn. Thank you. Assume that an engineering project has the following after-tax cash flows. If the MARR is 8%,
Please show work so I can learn. Thank you.
Assume that an engineering project has the following after-tax cash flows. If the MARR is 8%, what is the estimated present worth (PW) of this project?
End of Year | ATCF |
0 | -$150,000 |
1 | $35,000 |
2 | $40,000 |
3 | $40,000 |
4 | $45,000 |
5 | $50,000 |
6 | $50,000
|