Please use Excel sheet .. 1.As the production planner for Xiangling Hu Products, Inc., you have been given a bill of material for a bracket

Please use Excel sheet ..

1.As the production planner for Xiangling Hu Products, Inc., you have been given a bill of material for a bracket that is made up of a base, two springs, and four clamps. The base is assembled from one clamp and two housings. Each clamp has one handle and one casting. Each housing has two bearings and one shaft. There is no inventory on hand. a) Design a product structure noting the quantities for each item and show the low-level coding. b) Determine the gross quantities needed of each item if you are to assemble 50 brackets. c) Compute the net quantities needed if there are 25 of the base and 100 of the clamp in stock. PX

2.Your boss at Xiangling Hu Products, Inc., has just provided you with the schedule and lead times for the bracket in Problem 14.3. The unit is to be prepared in week 10. The lead times for the components are bracket (1 week), base (1 week), spring (1 week), clamp (1 week), housing (2 weeks), handle (1 week), casting (3 weeks), bearing (1 week), and shaft (1 week). a) Prepare the time-phased product structure for the bracket. b) In what week do you need to start the castings? PX

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Transport Operations

Authors: Allen Stuart

2nd Edition

978-0470115398, 0470115394

More Books

Students also viewed these General Management questions