Answered step by step
Verified Expert Solution
Question
1 Approved Answer
pls show work if possible Glassworks Inc. produces two types of glass shelving, rounded edge and squared edge, on the same production line. For the
pls show work if possible
Glassworks Inc. produces two types of glass shelving, rounded edge and squared edge, on the same production line. For the current period, the company reports the following data Direct materials Direct labor Overbed (300 ot direct labor cos) Total cost Quantity produced Loretage cost per tt rounded) Rodge Squared de Total 5700 521,600 $ 91,300 4,200 11,100 10.000 10.600 35,400 56,000 34,600 $60,000 5:03,300 10,500 14,000 tt. 14.93 Glassworks controller wishes to apply activity-based costing (ABC) to allocate the $54,000 of overhead costs incurred by the two product lines to see whether cost per foot would change markedly from that reported above. She has collected the following information Overhind cont category cost Leity controls Supervision 12.10 Depreciation of her 28.04 by Itse preparation 23.090 $54.00 She has also collected the following information about the cost drivers for each category (cost pool) and the amount of each driver used by the two product lines (Round activity rate and cost per unit answers to 2 decimal places.) Activacy Const Supervision Dearestations machine Devet Dlrede to conti nachts Hondage Total 6.700 13. 320,000 96 5 & 7 2 3 8 9 0 W E R T Y U o P S D G H J L V C V B N M and command Cost overhead Cost Category Activity control Supervision Depreciation of machinery Assembly line preparation Total overhead $ 2.160 28.646 23.000 $54,000 She has also collected the following information about the cost drivers for each category (cost pool and the amount of each driver used by the two product lines. (Round activity rate and cost per unit answers to 2 decimal places) Overhead cout Category Activity Control Supervision Depreciation of machinery bly line preparation Direct labor cost (5) Machines Setup (anber Hooded Edgeared de $5.200 $12,800 400 hours 100 hour 32 tinde 93 time $10.000 1.200 h 125 t Required: 1. Ansign these three overhead cost pools to each the two products using ADC Activity Overhead Cost Activity Drivers Supervision $ 2.160 18.000 Directors Depreciation of machinery 28.340 1.200 Machines Assembly line preparation 23.000 125 Setup Rounded edge Activity rate Supervision Den of machinery Por machine hour caminar PR Activity Rate 12001 of direct labor cost Per machine hour Por stup Activity driver Overhead assigned Incorred Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started