Answered step by step
Verified Expert Solution
Question
1 Approved Answer
PM Problem (Exercise 4). Determine the project's cost and duration alternatives. Times (durations) in days, costs are in $K. Perform three cycles of the
PM Problem (Exercise 4). Determine the project's cost and duration alternatives. Times (durations) in days, costs are in $K. Perform three cycles of the process: determine the crash design, the normal design, and the next two designs (a total of 4 project designs). Code NT CT NC CC Prec. A 12 10 50 100 B 16 12 70 100 A C 9 6 45 84 A D . 0 9 4 80 200 B. C E 20 20 30 30 C F 8 8 50 65 B, C G 3 1 20 100 D Provide the following answers here but be sure to upload all your work after the exam, 1. Crash design duration: 2. Normal design duration: 3. Normal design critical path: (type only the number) (type only the number) (do not place separators between the letters, for example if the critical path is X-Y-Z write XYZ) 4. What activity will be crashed in this iteration: 5. Project cost after first crash: dollar sign, or K letter) 6. Project cost after second crash: commas, dollar sign, or K letter) (a letter) (type only the number with no commas, (type only the number with no
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started