Positively Rivet Inc. is a small machine shop that produces sheet metal products. It had one line dedicated to the manufacture of light-duty vent hood

  1. Positively Rivet Inc. is a small machine shop that produces sheet metal products. It had one line dedicated to the manufacture of light-duty vent hood shells, but because of strong demand it recently added a second line. The new line makes use of higher-capacity automated equipment but consists of the same basic four processes as the old line. In addition, the new line makes use of one machine per workstation, while the old line has parallel machines at the workstations. The processes, along with their machine rates, number of machines per station, and average times for a lone job to go through a station (not including queue time), are provided below. Over the past 3 months, the old line has averaged 350 parts per day, where one day consists of one 8-hour shift, and has had an average WIP level of 400 parts. The new line has averaged 680 parts per eight-hour day with an average WIP level of 350 parts. Management has been dissatisfied with the performance of the old line because it is achieving lower throughput with higher WIP than the new line, Your job is to evaluate these two lines to the extent possible with the data provided and identify potentially attractive improvement paths for each line by addressing the following questions:
    1. Compute rb, To, and Wo for both lines. Which line has larger critical WIP? Explain why.
    2. Compute the best case and worst case performance benchmarks for the old and the new line.
    3. Compare the performance of both lines to their corresponding practical worst case. What can you conclude about the relative performance of the two lines compared to their underlying capabilities? Is management correct in criticizing the old line for inefficiency?
    4. If you were the manager in charge of these lines, what option would you consider first to improve the throughput of the old line? Of the new line?

Old Line

Process

Rate per Machine (parts/hr)

Number of Machines per station

Time (minutes)

Punching

15

4

4.0

Braking

12

4

5.0

Assembly

20

2

3.0

Finishing

50

1

1.2

New Line

Process

Rate per Machine (parts/hr)

Number of Machines per station

Time (minutes)

Punching

120

1

0.50

Braking

120

1

0.50

Assembly

125

1

0.48

Finishing

125

1

0.48

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

The Meaningful Money Handbook

Authors: Pete Matthew

1st Edition

0857196510, 978-0857196514

More Books

Students also viewed these Finance questions

Question

How do meanders start?

Answered: 1 week ago