Potem -JA-. - (Video) She State Codeign and builds factory-made premium wooden stairways for homes. The manufactured stairway components (spindles, risers, hangers, handraits) permit installation of faring length and with. All are of white sak wood Budgeted manufacturing overhead costs for the year 2020 are as follows Overhead Coat Pools Amount Purchasing $75,000 82.000 Production (cutting, miling, finching) 220,000 100,000 108,000 Inventory control raw materials and finished goods) 126,000 360,000 Total budgeted overhead costs $1.071.000 For the last years, Shaker Stairs Co. has been charging overhead to products on the basis of machine hours. For the year 2020, 100,000 machine hours are budgeted. Jeremy Nolan, owner manager of Shaker Stairs Co, recently directed his accountant, B Seagren, to implement the activity-based costing system that he has repeatedly proposed. At Jeremy Nolan's rest and the production foreman identify the following cost drivers and their usage for the previously budgeted overhead cost pools. Estimated Use of Activity Cost Poole Cost Drivers Cost Drivers 600 Number of orders Purchasing Handling materia Number of moves 8,000 Production (cutti, milling, finishing) Direct labor hours 100,000 Setting up machines Number of setups 1.250 Inspecting Number of inspections 6,000 Inventory control raw materials and finished goods) Number of components 168,000 Utilities Square feet occupied 90,000 Steve Hannon, sales manager, has received an order for 250 stairways from Community Builders, Inc., a large housing development contractor. At Steve's request, Bill prepares cost estimates for producing components for 250 stairways so Steve can submit a contract price per stairway to community Builders. He accumulates the following data for the production of 250 stairways Det materials $104,000 Direct labor $112,400 Machine hours 15,000 Direct labor hours 5,700 umber of purchase orders 60 Number of material moves 800 amber of machine setups 100 Number of inspection 450 Number of components 16,000 Number of square feet occupied 3,000 Compute the determined overhead rate using traditional conting with machine hours as the basis (Round answer to 2 decimal places. 12.25.) Predetermined overhead rate per machine hour VIDEO HILAR PROBLEM COME TO TEXT what is the manufacturing cost per stairway under traditional costing (Round answer to 2 decimal places, 12.25.) Cost per stairway VOISIRILAR PROBLEM RA TO TEXT LINK TO TEXT Calculate activity based overhead rate for each activity. (Round answers to 2 decimal places... 12.25) Activity Overhead Rate per order Handling materiale per move Production per D/L hour 5 Setting up machines per setup $ Inspecting per inspection s Inventory control $ per component Utta per sq.ft LINK TO TEXT VIDEO: SHILAR PROBLEM Calculate total overhead assigned under ABC Total overhead assigned ATTEET LINK TO TO VIDEO IRELAR