Practice Problems: Layout and Assembly 1. An assembly line with 17 tasks in series is to be balanced. The longest task is 2.4 minutes and

Practice Problems: Layout and Assembly 1. An assembly line with 17 tasks in series is to be balanced. The longest task is 2.4 minutes and total time for all tasks is 18 minutes. The line will operate 450 minutes per day. a) What are the minimum and maximum cycle times? (min:2.4; max: 18 mnts) b) What range of output is theoretically possibly (25 to 187.5) c) What are min number of workstations needed for max output? (8) d) What cycle time will provide an output of 125 units? (3.6 mnts) e) What output will result if cycle time is 9 minutes? (50)
image text in transcribed
1. An assembly line with 17 tasks in series is to be balanced. The longest task is 2.4 minutes and total time for all tasks is 18 minutes. The line will operate 450 minutes per day. a) What are the minimum and maximum cycle times? (min:2.4; max: 18mnts ) b) What range of output is theoretically possibly ( 25 to 187.5) c) What are min number of workstations needed for max output? (8) d) What cycle time will provide an output of 125 units? (3.6mnts) e) What output will result if cycle time is 9 minutes? (50)

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image_2

Step: 3

blur-text-image_3

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Management And The Arts

Authors: William J. Byrnes

5th Edition

0415663296, 978-0415663298

More Books

Students also viewed these General Management questions

Question

Describe Hobbess beliefs about human nature.

Answered: 1 week ago