Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Precision Manufacturing Inc. (PMI) makes two types of industrial component partsthe EX300 and the TX500. It annually produces 58,000 units of EX300 and 12,300 units

Precision Manufacturing Inc. (PMI) makes two types of industrial component partsthe EX300 and the TX500. It annually produces 58,000 units of EX300 and 12,300 units of TX500. The companys conventional cost system allocates manufacturing overhead to products using a plantwide overhead rate and direct labor dollars as the allocation base. Additional information relating to the companys two product lines is shown below:

EX300 TX500 Total
Direct materials $ 364,325 $ 160,550 $ 524,875
Direct labor $ 118,000 $ 41,500 $ 159,500

The company is considering implementing an activity-based costing system that distributes all of its manufacturing overhead to four activities as shown below:

Activity
Activity Cost Pool (and Activity Measure) Manufacturing Overhead EX300 TX500 Total
Machining (machine-hours) $ 209,300 88,000 61,500 149,500
Setups (setup hours) 131,100 65 280 345
Product-level (number of products) 83,870 1 1 2
General factory (direct labor dollars) 54,230 $ 118,000 $ 41,500 $ 159,500
Total manufacturing overhead cost $ 478,500

Required:

1-a. Compute the plantwide overhead rate that would be used in the companys conventional cost system.

1-b. Using the plantwide rate, compute the unit product cost for each product.

2-a. Compute the activity rate for each activity cost pool.

2-b. Using the activity rates, compute the unit product cost for each product.

1-a.

Compute the plantwide overhead rate that would be used in the companys conventional cost system. (Round your answer to 2 decimal places.)

Predetermined overhead rate. Per DL$

1-b.

Using the plantwide rate, compute the unit product cost for each product. (Round your intermediate calculations and final answers to 2 decimal places.)

EX300 TX500
Unit product cost

2-a.

Compute the activity rate for each activity cost pool. (Round your Machining and General factory activity rates to 2 decimal places.)

Activity Cost Pools Activity Rate
Machining per MHR
Setups per setup hr.
Product-level per product
General factory per DL$

2-b.

Using the activity rates, compute the unit product cost for each product. (Round your intermediate calculations and final answers to 2 decimal places.)

EX300 TX500
Unit product cost

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Intermediate Accounting 2007 FASB Update Volume 2

Authors: Donald E. Kieso, Jerry J. Weygandt, Terry D. Warfield

12th Edition

0470128763, 978-0470128763

More Books

Students also viewed these Accounting questions