Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Preliminary design work has been done on a process to recover a valuable product from an effluent gas stream the gas will be scrubbed with

Preliminary design work has been done on a process to recover a valuable product from an effluent gas stream the gas will be scrubbed with a solvent in a packed column the recovered product and solvent separated by distillation and the solvent could and recycled the major items of equipment that will be required as detailed below

1. Absorption column diameter 1 m vessel overall height 50 m, packed height 12m, parking 25 mm ceramic interlock saddles, vessel carbon steel, operating pressure 5 bar. 2. Recovery column: diameter 1 m vessel overall height 20 m, 35 sieve plates, vessel and plate stainless steel, operating pressure 1 bar. 3. Reboiler: forced conversion type, fixed tube sheets area 18.6 m, carbon steel shell, stainless steel tubes, operating pressure one bar. 4. condenser: fixed tube sheet area 25.3 m, carbon steel shell and tube operating pressure 1 bar. 5. Recycle solvent cooler U-tubes area 10.1 m, carbon steel shell and tubes, operating pressure 5 bar. 6. Solvent and product storage tank can proof capacity 35m, carbon steel. estimated service requirement. steam 200 kg per hour. cooling water 5000 kg per hour electrical power 100 kWh per day (360MJ/d). Estimated solvent loss 10 kg per day price 400/t. Plant attainment 95%. Estimate the capital investment required for this project and the annual operating cost.

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access with AI-Powered Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Students also viewed these Chemical Engineering questions