Answered step by step
Verified Expert Solution
Question
1 Approved Answer
PROBLEM 1 5 : A proposed pulp processing plant is expected to emit 1 2 ton per day of hydrogen sulfide from a single stack.
PROBLEM : A proposed pulp processing plant is expected to emit ton per day of hydrogen sulfide from a single stack. The company property extends a minimum of meters from the proposed location. The nearest receptor
is a small town of inhabitants meters northeast of the plant. Plant managers have decided that it is desirable to maintain concentrations below parts per billion by volume or approximately
for any period greater than minutes. Wind
direction frequencies indicate that winds blow
from the proposed location toward this town
between and per cent of the time. What
height stack should be erected? It is assumed
that a design wind speed of will be
sufficient, since the effective stack rise will be
quite great with winds less than
Other than this stipulation, assume that the
physical stack height and effective stack height
are the same, to incorporate a slight safety
factor.
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started