Problem 1: Given: You are the city engineer and wish to determine the estimated life-cycle costs for the construction and maintenance of a road system
Problem 1: Given: You are the city engineer and wish to determine the estimated life-cycle costs for the construction and maintenance of a road system assuming a 25-year service life. The initial cost of the project is $2M. Annual maintenance costs are estimated to be $50,000 throughout the life of the project. Assume 5% MARR and no salvage value throughout the analysis period. However, you are uncertain about the variables controlling life-cycle costs.
- Conduct a sensitivity analysis of the present worth life-cycle cost of the road system considering the error in estimating Initial cost, annual maintenance cost, service life, and MARR is within +/- 20% of the original estimates. Plot the results considering the range of error for each variable.
- Rank order the sensitivity of each variable affecting the estimated present worth life-cycle cost from highest to lowest.
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started