Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Problem 1 (Problem 4.4 in the Book) A manual assembly line is being planned for an assembled product whose annual demand is expected to be

image text in transcribed
Problem 1 (Problem 4.4 in the Book) A manual assembly line is being planned for an assembled product whose annual demand is expected to be 175,000 units/yr. The line will be operated two shifts (4000 hr/yr). Work content time of the product is 53.7 min. For planning purposes, the following line parameter values will be used: uptime efficiency = 96%, balancing efficiency = 94%, and repositioning time = 8 sec. Determine (a) the required hourly production rate of the line, (b) the cycle time, and (c) the ideal minimum number of workers required, and (d) the actual number of workers required based on the efficiencies given

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access with AI-Powered Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Students also viewed these Accounting questions