Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Problem 17-3A Applying activity-based costing LO P1, P3, A1, A2, C3 [The following information applies to the questions displayed below.) Craft Pro Machining produces machine

image text in transcribed
image text in transcribed
image text in transcribed
Problem 17-3A Applying activity-based costing LO P1, P3, A1, A2, C3 [The following information applies to the questions displayed below.) Craft Pro Machining produces machine tools for the construction industry. The followir were taken from its company records. Indirect Labor $330,000 Indirect Materials Other Overhead Production Activity Grinding Polishing Product modification Providing power System calibration $ 200,000 400,000 $235,000 470,000 Additional information on the drivers for its production activities follows. Grinding Polishing Product modification Providing power System calibration 13,000 machine hours 13,000 machine hours 1,600 engineering hours 18,000 direct labor hours 350 batches Job 3175 120 units 400 MH Job 4286 1,500 units 4,000 MH Number of units Machine hours Engineering hours Batches Direct labor hours 31 eng. 18 eng. hours hours 25 batches 450 DLH 75 batches 4,050 DLH 2. 3&4. Coule vy uvelle des AOL Combine the gribing and polishly GLUTVUSTUS Determine overhead costs to assign to the following jobs using ABC What is the overhead cost per unit for Job 3175? What is the overhead cost per un for Job 42867 (Round your activity rate and average overhead cost per unit to 2 decimal places. Round overhead assigned to the nearest whole dollar) Activity Overhead Cost Activity Divers Overhead Activity dr Overhead Activity Rate Activity driver iced Caining & Poshing Machine hours Engineering ins Product modification Providing power Directors System cabo Product modification Providing power System calibration 1,600 engineering hours 18,000 direct labor hours 350 batches Job 3175 120 units 400 H Job 4286 1,500 units 4,000 MH Number of units Machine hours Engineering hours Batches Direct labor hours 31 hours eng. 18 eng. 25 batches 450 DLH hours 75 batches 4,050 DLH Problem 17-3A Part 5 5. If the company uses a plantwide overhead rate based on direct labor hours, what is the overhead cost for each unit of Job 3175? Of Job 4286? (Do not round intermediate calculations. Round "OH Cost per unit" answers to 2 decimal places.) Product DL hours Plantwide OH rate Total Overhead Cost Units Produced OH Cost per unit Job 3175 Job 4286

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

CA FOUNDATION FINANCIAL ACCOUNTING BY NSHAH MODULE I

Authors: Sanjay Nanak Chand Thadhani

1st Edition

172887419X, 978-1728874197

More Books

Students also viewed these Accounting questions