Problem 19-1A Computing job costs and overhead ratc; absigning costs to inventory Cl P3 At the end of Jane, the job cost shects at Ace Roofens show the following conts accumulated on three jobs Additional information a. Job 5 was staned in May, and the following costs wete assigned to it is May; direct materials, $6,000, direct labor, $1.800; and applied overbead, 5900 . Job 5 was finished in Jur b. Job 6 and Job 7 were started in Jane, Job 6 was finished in June, and Job 7 is to be completed in July. c. Overbead cout is applied with a predetermined rate based on direct labor cost. The predetermined overhead rate did not change scross these months. Revisired 1. What is the total cost of direct materials requisinioned in June? 2. What is the vital cost of direst lahor used in June? 3. What is the predetermined overbead rite? 4. What is the total cost transfened to Finished Goods Inventory in Junc't Problem 19-1A Computing job costs and overhead ratc; absigning costs to inventory Cl P3 At the end of Jane, the job cost shects at Ace Roofens show the following conts accumulated on three jobs Additional information a. Job 5 was staned in May, and the following costs wete assigned to it is May; direct materials, $6,000, direct labor, $1.800; and applied overbead, 5900 . Job 5 was finished in Jur b. Job 6 and Job 7 were started in Jane, Job 6 was finished in June, and Job 7 is to be completed in July. c. Overbead cout is applied with a predetermined rate based on direct labor cost. The predetermined overhead rate did not change scross these months. Revisired 1. What is the total cost of direct materials requisinioned in June? 2. What is the vital cost of direst lahor used in June? 3. What is the predetermined overbead rite? 4. What is the total cost transfened to Finished Goods Inventory in Junc't