Problem 3-27: You have been asked to prepare a quick estimate of the construction cost for a coal-fired electricity generating plant and facilities. A work

image text in transcribed
image text in transcribed
Problem 3-27: You have been asked to prepare a quick estimate of the construction cost for a coal-fired electricity generating plant and facilities. A work breakdown stracture (levels one through three) is shown is Table P3-27. You have the following information available A coal-fired generating plant twice the size of the one you are estimating was built in 1988 The 1988 boiler (1.2) and boiler support system (1.3) cost $110 million. The cost index for boilers was 110 in 1988, it is 492 in 2011. The cost capacity factor for similar boilers and support systems is 0.9. The 600-acre site is on property you already own, but improvements (1.1.1) and roads (1.1.2) will cost $2,000 per acre, and railroads (1.1.3) will cost $3,000,000. Project integration ( 1.9) is projected to cost 3% of all other construction costs. . The security systems (1.5.4) are expected to cost $1,500 per acre, according to recent (2011) construction of similar plants. All other support facilities and equipment (1.5) elements are to be built by Viscount Engineering. Viscount Engineering has built the support facilities and equipment elements for two similar generating plants. Their experience is expected to reduce labor requirements substantially: a 90% learning curve can be assumed. Viscount built the support facilities and equipment on their first job in 95,000 hours. For this project, Viscount's labor will be billed to you at $60 per hour. Viscount estimates that materials for the construction of the support facilities and equipment elements (except 1.5.4) will cost you S15,000.000. . The coal storage facility (1.4) for the coal-fired generating plant built in 1988 cost $5 million. Although your plant is smaller, you require the same size coal storage facility as Due date: Thursday-7/3/2019 CIVL5204: Engineering Economic Civil and Architectural Engineering Department SP19 Sultan Qaboos University the 1988 plant. You assume you can apply the cost index for similar boilers to the coal storage facility What is your eslimated 2011 cost for building the coal-fired gencrating facility? Summarize your calculations in a cost estimating worksheet, and state the assumptions you make (20 marks) TABLE P3-27 PROJECT Coal-Fired Electricity Generating Plant and Facilities Line No. WBS Element Code 001 Coal-fired power plant Site Land improvements Roads, parking, and paved areas Railroads Boiler 004 12.1 1.22 1.2.3 1.24 Pressure vessel Heat exchange system Generators 010 Boiler support system Coal transport system Coal pulverizing system Instrumentation and control 012 1.3.1 1.3.2 1.33 1.34 1.3.5 014 015 Ash disposal system Transformers and distribution 016 017 018 Stockpile reclaim systenm Coal storage facility 1.4.1 1.4.2 14.3 019 Rail car dump Coal handling equipment Support facilities and equipment Hazardous waste systems Support equipment Uitilities and communications system Security systems Project integration Proect management Environmental management Proect safety Quality assurance Test, start-up, and transition management 1.5.1 I53 1.54 024 193 194

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Critical Marketing Audit The Case Of Apple Inc.

Authors: Joseph Katie

1st Edition

365637712X, 978-3656377122

More Books

Students also viewed these Accounting questions