Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Problem 4-12 Contrasting ABC and Conventional Product Cost [LO4-2, LO4-3, LO4-4] Precision Manufacturing Inc. (PMI) makes two types of industrial component parts-the EX300 and the

image text in transcribedimage text in transcribedimage text in transcribedimage text in transcribed

Problem 4-12 Contrasting ABC and Conventional Product Cost [LO4-2, LO4-3, LO4-4] Precision Manufacturing Inc. (PMI) makes two types of industrial component parts-the EX300 and the TX500. It annually produces 63,000 units of EX300 and 12,800 units of TX500. The company's conventional cost system allocates manufacturing overhead to products using a plantwide overhead rate and direct labor dollars as the allocation base. Additional information relating to the company's two product lines is shown below: Direct materials Direct labor EX300 $369, 325 $ 123,000 TX500 $ 165,550 $ 44,000 Total $534,875 $167,000 The company is considering implementing an activity-based costing system that distributes all of its manufacturing overhead to four activities as shown below: Activity Activity Cost Pool (and Activity Measure) Machining machine-hours) Setups (setup hours) Product-level (number of products) General factory (direct labor dollars) Total manufacturing overhead cost Manufacturing Overhead $ 227,650 180,600 91,080 68, 470 $567,800 EX300 93,000 90 1 $ 123,000 TX500 64,000 330 1 $ 44,000 Total 157,000 420 $167,000 Required: 1-a. Compute the plantwide overhead rate that would be used in the company's conventional cost system. 1-b. Using the plantwide rate, compute the unit product cost for each product. 2-a. Compute the activity rate for each activity cost pool. 2-b. Using the activity rates, compute the unit product cost for each product. Complete this question by entering your answers in the tabs below. Req 1A Reg 1B Req 2A Req 2B Compute the plantwide overhead rate that would be used in the company's conventional cost system. (Round your answer to 2 decimal places.) Predetermined overhead rate per DL $ Req 1A Req 1B > Complete this question by entering your answers in the tabs below. Req 1A Req 1B Req 2A Req 2B Using the plantwide rate, compute the unit product cost for each product. (Round your intermediate calculations and final answers to 2 decimal places.) EX300 TX500 Unit product cost Complete this question by entering your answers in the tabs below. Req 1A Req 1B Req 2A Req 2B Compute the activity rate for each activity cost pool. (Round your Machining and General factory activity rates to 2 decimal places.) Activity Rate per MHR Activity Cost Pools Machining Setups Product-level General factory per setup hr. per product per DL $ Complete this question by entering your answers in the tabs below. Req 1A Req 1B Req 2A Reg 2B Using the activity rates, compute the unit product cost for each product. (Round your intermediate calculations and final answers to 2 decimal places.) EX300 TX500 Unit product cost

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Connect 2-semester For Auditing & Assurance Services A Systematic Approach

Authors: Author

10th Edition

1259292045, 9781259292040

More Books

Students also viewed these Accounting questions